My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL35136
DRMS
>
Back File Migration
>
General Documents
>
GENERAL35136
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:16 PM
Creation date
11/23/2007 8:11:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981023
IBM Index Class Name
General Documents
Doc Date
10/12/1982
Doc Name
PROPOSED DECISION AND FINDINGS OF COMPLIANCE
From
Old Name Martinez Strip Mine
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i _ .- _-_ - - ~ _------ ---------- --.. __ ~~4.__~. - <br />- , -- <br />9 <br />-35- <br />The proposed haul road will cross the gas pipeline referenced in the explosives <br />section. In light of this the following stipulation is required: <br />Stipulation <br />24. CHIMNEY ROCA COAL MUST SUBMIT DOCUl9ENTATION THAT APPROVAL HAS BEEN GRANTED <br />FROM WESTERN SLOPE GAS COMPANY BEFORE THE Ha UL ROAD CROSSES THE PIPELINE. <br />As mentioned above, t::ere is only one main access/haul road xithin the proposed <br />permit area. This road is also utilized to gain access to States Xiyhwau 151, <br />which is the main transportation corridor leading from the site. In addition, <br />there are three Light use roads at the mine. These roads are used togain <br />access to monitoring :cells, sediment ponds and diversion ditches for inspection <br />and monitoring purposes. <br />[Jith acceptance of the above stipulations the proposed operation is in compliance. <br />X.YI. Bonding - Rule 2.05.4(2)(b) <br />The Division has calculated Chimney Rock's bond at 5435,850.00. The Division <br />feels this atrnunt would be adequate to reclaim the The bonding amount <br />was calculated as follows: <br />East Side (Active Pit Area) <br />I. Blasting $ 21,990.74 <br />2. Backfilling 192,236.14 <br />3. Grading 9,630.74 <br />9. Topsoil Replacement 18, 3I 2.10 <br />S. Drain Construction 7,000.00 <br />6. Revegetatior./Soil Amendments 49,403.60 <br />$293,523.32 <br />West Side (Barren Ridge) <br />1. Blasting $ 54,228.93 <br />2. Backfilling 25,125.65 <br />3. Grading 2,057.00 <br />4. Topsoil Replacement 10,537.51 <br />5. Revegetation/Soil Amendments 21,860.00 <br />5113,807.09 <br />Total Bond Cost <br />East Sides $293,523.32 <br />west Side 113,A07.09 <br />Subtotal $407.330.41 <br />administrative Costs 7% 28,513.12 <br />TOTAL $435,843.54 <br />This amount was rounded to 5935,900.00 <br />tJi cii the pos ti rc of this bond amount, the proposed operation is in compliance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.