Laserfiche WebLink
MRR-11-1994 1353 FROM ~WRM TECH Sl1C IIEU LRB <br />:a:zi.e of Culorado <br />t'di.irnd Lani1 liaclumation <br />Section S. <br />Section 9: <br />III. Exhibit B - Maps <br />1. The 26.8 acres <br />a~ adjacent to <br />within 'C lie red <br />Cut 1. Sec al <br />TO 13038328166 P.005i007 <br />• Page 3 <br />SE/!„ S/?_ S/2 NE/4 located south of US 50, <br />~/~ ~~~~ NW/ti, E/2 E/2 SW/4 and E/2 W/2 <br />W/2 located south of US 50, W/2 SE/4 <br />located south of U5 50. <br />listed in Exhibit D(d) (i) (major disturbance) <br />Cut 1 for storage of topsoil 3s designated <br />outlined affected ares, east and north of <br />~o Exhibit C (.a ). <br />2. Adjacent landowner designation on maps. <br />ExhiUi.t C(s) explains buffer zones of Ideal land that <br />separates affected land from adjacent landowners. Also, <br />e letter dated April 12, 1978 referencing publication <br />included the following sentence, "Please advise if the <br />Board or. staff wish to designate any parties to which <br />l:~cal should mail. the Notice of Publication." <br />IV. Exhibit D - Minfng Plan <br />1 & 2. _ The thickness of. limestone,overburden, soil <br />materials, gravels snd sandstone was explained <br />i.n I, 3 (.iii) above. <br />:. Paragrzpkz (e) Page 2, Exhibit D <br />Cuts 9 and 11 are the last cuts at the northwest <br />corner of the west quarry. The reclamation plan map, <br />>rxlzib:it r, indicates theoe cuts will be only partially <br />backl';il.led and graded to about 3 to 1 slopes prior to <br />reclamation. Prior to starting Cute 9 and 11, explora- <br />tion will determine whether it will be practical to <br />ai;ain move the pas line westward in order to quarry <br />~%Atl~) nub.l.:i.zied i.n gI•ecn and purchased by Ideal in 1977. <br />If prai:t.ical to quarry .this land, Cuts 13 and 15 will <br />li.lccly be designated in this area. <br />i <br />.~ <br />