My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34916
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:09 PM
Creation date
11/23/2007 8:06:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
7/10/1992
Doc Name
INVITATION AND BID
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Movement of personnel, equipment, operation supplies, and <br />incidentals to the project site, but not within the work limit area; <br />c. Establishment of office, buildings, plants, and other necessary <br />facilities at the project site, but not within the work limit area; <br />d. Preparatory work at the construction site; <br />e. Demobilization of CONTRACTOR'S equipment and all other facilities, <br />final project clean-up, and for all other work for which payment is <br />not otherwise provided for under the contract. <br />The temporary works and construction plant may include, but not be limited to <br />the following: <br />a. Workshops, office, storage yards, and construction plant and <br />equipment including spare parts, fuels, and oil; <br />b. Sanitation facilities, communication facilities, and sprinkler <br />trucks; <br />c. Contractor's electrical power system; <br />d. Other items such as water, compressed air, etc., not specifically <br />listed but required for the functioning of construction activities. <br />EXECUTION <br />Mobilization <br />Upon receipt of the Notice to Proceed, the CONTRACTOR shall furnish, mobilize, <br />move in, and install such temporary works, equipment and construction plant as <br />are necessary for the successful completion of the work. The CONTRACTOR shall <br />also operate and maintain such temporary works, equipment and construction <br />plant throughout the period of construction. All applicable temporary works, <br />such as sanitation facilities, shall fully comply with any rules and <br />regulations. <br />Clearing and grubbing operations necessary for the temporary works, if any, <br />shall also be included as mobilization. <br />Demobilization <br />Upon completion of the work •~nder this Contract, the CONTRACTOR shall remove <br />all temporary works, equipment and construction plant. The CONTRACTOR shall <br />remove from the work site all rubbish, unused materials, and shall fill and <br />dress all holes and cavities made for convenience, and leave all areas in good <br />order and condition, subject to the approval of the PROJECT MANAGER. <br />MEASUREMENT AND PAYMENT <br />No measurement for payment shall be made for mobilization and demobilization. <br />Payment of two-thirds of the lump sum price bid will be made with the first <br />monthly progress payment after completion of the work described above for <br />mobilization. Payment of one-third of the lump sum price bid will be made <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.