Laserfiche WebLink
tipulation No. 20: <br />SURVEYING OF THREE MONITORING STATIONS AT BEAR N0. 2 MINE SHALL BE <br />REPEATED ON A SEMI-ANNUAL BASIS FOR A PERIOD OF TWO YEARS. RESULTS OF <br />THE SURVEYING OF THESE STATIONS SHALL BE SUBMITTED TO THE DIVISION <br />WITHIN 30 DAYS FOLLOWING COMPLETION OF THE SEMI-ANNUAL SURVEY. IF <br />MONITORING OF THE BACKFILLED AREA DETECTS MOVEMENT, WHICH THE DIVISION <br />DETERMINES TO REPRESENT AN INDICATION OF IMMINENT HAZARD, THE BEAR <br />COAL COMPANY SHALL EXPEDITIOUSLY DEVELOP AND IMPLEMENT, FOLLOWING THE <br />DIVISION'S APPROVAL, A PLAN TO MITIGATE THAT HAZARD AND TO STABILIZE <br />THE BACKFILLED AREAS. <br />Status: Terminated. <br />Stipulation No. 21: <br />THE DIVISION DIRECTS BEAR COAL COMPANY TO CONTINUE TO MONITOR BOTH THE <br />OPERATIONAL AND RECLAIMED CONFIGURATIONS OF THE AORTAL ACCESS ROAD AND <br />PORTAL FACILITIES ~ THE N0. 3 MINE. MONITORING SHALL CONTINUE ON A <br />SEMI-ANNUAL BASIS UNTIL 2 YEARS FOLLOWING COMPLETION OF THE <br />RECLAMATION OF THE PORTAL ACCESS ROAD AND PORTAL FACILITY AREA. <br />RESULTS OF THE SEMI-ANNUAL MONITORING SHALL BE SUBMITTED TO THE <br />DIVISION WITHIN 30 DAYS FOLLOWING COMPLETION OF THAT SEMI-ANNUAL <br />MONITORING. IF MONITORING OF THE BACKFILLED AREA DETECTS MOVEMENT, <br />WHICH THE DIVISION DETERMINES TU REPRESENT AN INDICATION OF IMMINENT <br />HAZARD, THE BEAR COAL COMPANY SHALL EXPEDITIOUSLY DEVELOP AND <br />IMPLEMENT, FOLLOWING THE DIVISION'S APPROVAL, A PLAN TO MITIGATE THAT <br />HAZARD AND TO STABILIZE THE BACKFILLED AREAS. <br />Status: Active. <br />Stipulation No. 22: <br />THE DIVISION DIRECTS BEAR COAL COMPANY TO SUBMIT A COMPLETED COAL <br />RECLAMATION BOND FOR USE WITH CERTIFICATE OF DEPOSIT, FEDERAL MINES <br />FURM FUR THE $14,400 CERTIFICATE OF DEPOSIT (#1960) HELD FOR THE <br />DIVISION BY UNITED BANK OF DELTA. BEAR COAL COMPANY IS FURTHER <br />DIRECTED TO ADD THE UNITED STATES GOVERNMENT TO THIS CERTIFICATE OF <br />DEPOSIT AS A JOINT OBLIGEE. THE COMPLETED FORM AND PROOF OF ADDITION <br />OF THE UNITED STATES GOVERNMENT TO THE CERTIFICATE OF DEPOSIT MUST BE <br />SUBMITTED TO THE DIVISION WITHIN 60 DAYS OF PERMIT RENEWAL. <br />Status: Terminated. <br />-22- <br />.., . . <br />