Laserfiche WebLink
Stipulation No. 23: <br />BEAR COAL COMPANY MUST SUBMIT A SATISFACTORY TECHNICAL REVISION TO THE <br />DIVISION FOR A PERMANENT UNDERGROUND DEVELOPMENT WASTE ROCK PILE. <br />TRANSFER OF THE TEMPORARY GOB STOCKPILE TO AN APPROVED PERMANENT PILE <br />MUST BE COMPLETED BY APRIL 30, 1988. PILE WAS NEVER CONSTRUCTED SO <br />STIPULATION FORGIVEN. <br />Status: Terminated. <br />Stipulation No. 24: <br />BEAR COAL WILL SUBMIT THREE (3) REVISED COPIES OF MAP 10 (MINE <br />FACILITIES MAP) TO THE DIVISION BY APRIL 30, 1989. <br />Status: Terminated. <br />Stipulation No. 25: <br />BEAR COAL COMPANY WILL INCORPORATE THE REVISION (TR-03, B-SEAM MINE <br />PLAN) INTO THE PERMIT APPLICATION AS REPLACEMENT PAGES BY MAY 31, 1989. <br />Status <br />Stipulation No <br />Compl Ted with, <br />26: <br />BEAR COAL SHALL COLLECT TWO GEOCHEMICAL SAMPLES FOR THE PROPOSED <br />PERMANENT WASTE PILE; ONE SHALL BE FROM THE B-SEAM FLOOR COAL AND <br />ANOTHER FkOM THE ROOF ROCK OVERLYING THE B-SEAM. THE FOLLOWING <br />PARAMETERS WILL BE ANALYSED: <br />Lithologic Classification <br />Textural Analysis <br />% Sand <br />% Silt <br />% Clay <br />Saturation Percentage <br />Sodium Adsorption Ratio (SAR) <br />Calcium <br />Magnesium <br />Nitrate - Nitrite <br />Sodium <br />Sulfur <br />% pyritic sulfur <br />% sulfate sulfur <br />% organic sulfur <br />Total sulfur <br />Status: Compl Ted wi th. <br />SUMMARY OF STIPULATION STATUS: <br />Active Stipulations <br />Stipulations which <br />1, 2, 3, 5, 7, 8, <br />23, 24, 25, 26. <br />Neutralization Potential <br />Acid Base Potential <br />Arsenic <br />Boron <br />Cadmium <br />Copper <br />Iron <br />Lead <br />Manganese <br />Mercury <br />Molybdenum <br />Selenium <br />Zinc <br />pH <br />Electrical conductivity <br />Total Combustible Solids <br />4, 6, 21 <br />have been complied with or terminated: <br />9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 22, <br />5161E/scg <br />-23- -~, ., a <br />