Laserfiche WebLink
Stipulation No. )6: <br />WITHIN SIXTY (60) DAYS UPON <br />SHALL SUBMIT DOCUMENTATION <br />DEMONSTRATES THAT EITHER A <br />FOR TO WITHDRAW WATER FkOM <br />THE GUNNISON. <br />Status: Terminated. <br />APPROVAL OF THIS PERMIT REVISION, BEAR <br />FROM THE STATE ENGINEER'S OFFICE WHICH <br />PERMIT IS NOT REQUIRED OR HAS BEEN APPLIED <br />A WELL IN THE ALLUVIUM OF THE NORTH FORK OF <br />Stipulation No. 17: <br />THE DIVISION DIRECTS BEAR COAL COMPANY TO CONTINUE TO MONITOR BOTH THE <br />OPERATIONAL AND RECLAIMED CONFIGURATIONS OF THE PORTAL ACCESS ROAD AND <br />PORTAL FACILITIES (~' THE N0. 3 MINE. RESULTS OF THE SEMI-ANNUAL <br />MONITORING SHALL BE SUBMITTED TO THE DIVISION WITHIN 30 DAYS FOLLOWING <br />COMPLETION OF THAT SEMI-ANNUAL MONITORING. IF THE MONITORING OF THESE <br />FACILITIES DETECTS ANY IMMINENT HAZARD, IN THE OPINION OF THE <br />DIVISION, BEAk COAL COMPANY SHALL EXPEDITIOUSLY DEVELOP AND IMPLEMENT, <br />FOLLOWING DIVISION APPROVAL, A PLAN TO MITIGATE THAT HAZARD AND TO <br />STABILIZE THE AFFECTED SLOPE. <br />Status: Terminated. <br />Stipulation No. 18: <br />THE DIVISION DIRECTS BEAR COAL COMPANY TO INSTALL 2 ADDITIONAL <br />SUBSIDENCE MONITORING MONUMENTS WITHIN THE MAPPED LANDSLIDE DEPOSIT. <br />THE COMPANY SHALL INSTALL THESE ADDITIONAL MONUMENTS AT LOCATIONS <br />APPROVED BY THE DIVISION. BECAUSE OF THE IMPORTANCE OF INSTALLING AND <br />SURVEYING THE LOCATION CF THESE MONUMENTS PRIOR 70 UNDERMINING OF THE <br />MONUMENT LOCATIONS, THE DIVISION DIRECTS BEAR COAL COMPANY TO COMPLETE <br />INSTALLATION AND INITIAL SURVEYING OF THESE MONUMENTS NO LATER THAN 30 <br />DAYS FOLLOWING APPROVAL OF THIS PERMIT REVISION APP. <br />Siaius: Terminated. <br />Stipulation No. 19: <br />THE DIVISION DIRECTS BEAR COAL COMPANY TO COMPLETE A DETAILED ANALYSIS <br />OF THE POTENTIAL EFFECTS OF SUBSIDENCE UPON THE STABILITY OF THE <br />LANDSLIDE DEPOSITS LOCATED ABOVE THE PROPOSED UNDERGROUND WORKINGS OF <br />THE BEAR N0. 3 MINE, OPPOSITE THE TOWN OF SOMERSET. BEAR COAL COMPANY <br />SHALL INSTALL AND MONITOR ADDITIONAL MONUMENTS ON THE LANDSLIDE <br />DEPOSITS, IF NECESSARY, IN ORDER TO OBSERVE THE POTENTIAL DISPLACEMENT <br />OF THE LANDFORM. THE DETAILED TECHNICAL ANALYSIS SHALL BE COMPLETED <br />AND SUBMITTED TO THE DIVISION FOR REVIEW AND APPROVAL. BEAR COAL <br />SHALL LIMIT FURTHER EXTRACTION TO OEVELOPMENi ONLY, NOT TO EXCEED 50% <br />EXTRACTION, IN ACCORDANCE WITH THE DETAILED PLATE INCLUDED ON THEIR <br />REVISED "MINE PLAN" MAP, MAP N0. 9. NO RETREAT MINIIJG SHALL OCCUR <br />WITHIN THE REMAINING PORTIONS OF THE BEAR N0. 3 MINE, PRIOR TO THE <br />RECEIPT OF WRITTEN APPROVAL FROM THE DIVISION. IF SUBSIDENCE <br />MONITORING EXPERIENCE OR THE DETAILED STABILITY ANALYSIS INDICATES <br />THAT RETREAT EXTRACTION WOULD ADVERSELY AFFECT THE STABILITY OF THE <br />LANDSLIDE DEPOSITS OPPOSITE THE TOWN OF SOMERSET, THEN BEAR COAL <br />COMPANY SHALL SUBMIT A REVISED LIMITED EXTRACTION MINE PLAN FOR THE <br />BEAR N0. 3 MINE, DESIGNED TO PRECLUDE DISRUPTIVE DIFFERENTIAL <br />SUBSIDENCE OF THE LANDSLIDE DEPOSITS. <br />Status: Terminated. <br />.. <br />