My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34912
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:09 PM
Creation date
11/23/2007 8:06:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
3/20/1990
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stipulation No. ]2: <br />WITHIN ONE MONTH OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT A PLAN <br />TO THE DIVISION FOR REPLACEMENT AND STORAGE OF ALL NON-COAL WASTES IN <br />A DESIGNATED PORTION OF THE PERMIT AREA TO ENSURE THAT LEACHATE AND <br />SURFACE RUNOFF DO NOT DEGRADE SURFACE OR GROUND WATER. A PLAN FOR <br />FINAL DISPOSAL OF NON-COAL WASTES IN A DESIGNATED DISPOSAL SITE WILL <br />ALSO BE SUBMITTED. <br />Status: Terminated. <br />Stipulation No. 13: <br />WITHIN ONE MONTH OF PERMIT ISSUANCE, AN OPERATION DESCRIPTION, A <br />SEDIMENT CONTROL PLAN, ANO A RECLAMATION PLAN FOR THE LOAOOUT WILL BE <br />SUBMITTED TO THE DIVISION AND INCORPORATED INTO THE PERMIT. <br />Status: Terminated. <br />Stipulation No. 14: <br />WITHIN TWO MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT TO THE <br />DIVISION AN ACCEPTABLE PLAN FOR SNOW REMOVAL AND DISPOSAL, TO INSURE <br />THAT SNOW ANO ROAD SURFACING MATERIAL IS DISPOSED OF IN AN APPROPRIATE <br />AREA, AND DOES NOT INTERFERE WITH SURFACE DRAINAGE. <br />Status: Terminated. <br />Stipulation No. 15: <br />THE DIVISION DIRECTS BEAR COAL CO. TO SUBMIT A SUBSIDENCE MONITORING <br />PROGRAM FOR REVIEW AND APPROVAL BY THE DIVISION. THIS PROGRAM SHALL <br />INCLUDE THE INSTALLATION OF APPROPRIATE PROFILE LINES OF PERMANENT <br />MONUMENTS, CAPABLE OF RESISTING NORMAL TRAFFIC AND METEOROLOGICAL <br />PHENOMENA. MONUMENTS SHALL BE LOCATED 70 MONITOR POSSIBLE SUBSIDENCE <br />OF AREAS DESIGNATED FOR THE INITIATION OF RETREAT OR SECONDARY <br />EXTRACTION. THESE PLANS SHALL INCLUDE A TYPICAL MONUMENT DETAIL <br />DRAWING. THIS SUBSIDENCE MONITORING PROGRAM SHALL BE SUBMITTED, FOR <br />REVIEW BY THE DIVISION, WITHIN 30 DAYS FOLLOWING PERMIT APPROVAL. <br />FURTHER, THE APPROVED SUBSIDENCE MONITORING MONUMENTS SHALL BE <br />INSTALLED AND INITIALLY MONITORED PRIOR 70 THE COMMENCEMENT OF RETREAT <br />OR SECONDARY EXTRACTION WITHIN THE BEAR N0. 3 14INE. FOLLOWING THE <br />INITIAL MONITORING, THE SUBSIDENCE MONUMENTS SHALL BE MONITORED ON A <br />SEMI-ANNUAL BASIS AND THE RESULTS OF THAT MONITORING SHALL BE <br />SUBMITTED TO THE DIVISION WITHIN 30 DAYS FOLLOWING COMPLETION CF EACH <br />MONITORING SURVEY. <br />Status: Terminated. <br />-20- <br />.fi. .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.