My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL34726
DRMS
>
Back File Migration
>
General Documents
>
GENERAL34726
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:56:03 PM
Creation date
11/23/2007 8:01:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
4/21/1983
Doc Name
PERMIT APPLICATION STIPULATIONS 8 9 & 11
From
GEC MINERALS INC
To
MLRD
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_~ <br />for both topsoil land subsoil by mining phases, acres as well as <br />soil types. GEC~has revised the Table - Topsoil/Subsoil Schedule <br />for Mining Area and the Table - Topsoil/Subsoil Removal Plan. The <br />former gives thedirect relationship between the soils removed <br />and the topsoil/subsoil stockpile by years. The latter points out <br />the actual volumes of topsoil removed by soil types and by year. <br />A specific Table - Topsoil/Subsoil Stockpile Information, also was <br />included, which gave each specific topsoil/subsoil stockpile number, <br />size, volume andlocation (Map 19, Topsoil Handling, Map 11, Soils, <br />are attached for~your reference.) <br />Zell -Temporary Overburden Stockpile #1 and H2 were physically <br />measured The volumes were 155,062 LCY and 315,741 LCY <br />respectively. Stockpile !el was originally come from <br />Dorchester's surface facilities area. Therefore, those <br />overburden materials shall have to be returned to this <br />specific area right after Dorchester is through with <br />mining. In Stockpile sit, 234,032 LCY of the 315,741 LCY <br />overburden material were designated stockpiling for GEC's <br />West Pit per agreement with Newlin Creek Mine dated October <br />15, 1982. This material will have to be used for the <br />West Pit final backfilling. The deadline for the extension <br />of the West Pit reclamation will be approximately 18 months <br />from the date of the agreement. It depends on Newlin Creek <br />Mine's filnal decision. A backfill/stockpiling bonding <br />amount of $143,000 has been put up by Newlin Creek for this <br />purpose.) The remianing 81,700 LCY overburden material was <br />planned for the final backfilling of Phase II area, which was <br />proposed to be carried out later part of 1983 and early part <br />of 1984. <br />-Previous~Disturbed Area (West of East Are <br />.- ~ , <br />Carol Russell <br />MLRD-Permit Stipulations <br />April 3, 1983 <br />Page 2 <br />In order <br />area, a <br />has been <br />The resu <br />and the <br />approxim <br />no more <br />ed to ba <br />with rip <br />to 36 in <br />Hess. i <br />The over <br />Since th <br />turbed b <br />o evaluate the material balance in this specific <br />oss-Section West of the East Area (Worst Case) <br />raven, and a detailed calculation also was made. <br />s indicated that to assure the post-mining surface <br />annel geometry (i.e., slope, width, shape) in <br />ely 7.1% over the entire channel bed, a total of <br />an 36,000 LCY of overburden material will be need- <br />fill the channel area. The channel will be lined <br />p, the sizing of riprap rock ranged from four inches <br />es. The riprap shall be one to two feet in thick- <br />overbank will have a slope of approximately 2 to 1. <br />nk area beyond the riprap area shall be vegetated. <br />area, particularly along the channel bed was dis- <br />previous operator, the revegetation portion GEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.