Response: <br />The fuel tank east of the shop building is empty and has never been used. The fuel tank <br />off the northwest comer of the shop had an earthen containment structure; this tank has been <br />removed; there is no fuel spillage at this site. <br />Topsoil Stockpile: <br />A topsoil stockpile exists at the west end of the dump; stockpile is stable but could be <br />impacted by further dump expansion; this stockpile should be protected. <br />Response: <br />The topsoil stockpile remains and is stable; the location of the stockpile is shown on the <br />1" = 100' map submitted herewith. <br />East Expansion of Waste Dui: <br />The east toe of the waste dump has extended beyond the shape shown in earlier maps. If <br />the waste dump toe must be moved or channel structures installed, this should be shown on the <br />new maps which is required to be submitted. <br />Response: <br />The Operator submitted an updated site map in April 1998. This map did not provide the <br />information requested during the July 1997 Inspection. Anew and accurate map is submitted <br />herewith. The current map shows the current location of the dump toe and the channel diversion <br />structure around the east dump toe. <br />April 23, 1998 Lelter from Division: <br />Permit Area: <br />The Operator submitted a site map on April 18, 1998. The site map presented a 5-sided <br />polygon which does not conform to existing Permit boundary maps on file with the Division. <br />Response: <br />The Operator has submitted a new map herewith; this new map presents a Proposed <br />Affected Area boundary which completely encompasses all site disturbance and also provides for <br />future reclamation of the mine site. <br />Exceedance of Original Permit Boundary: <br />The map submitted in April 1998 shows disturbance on ground outside of the original <br />Permit boundary. Additionally, the revised 5-sided polygon submitted by the Operator would <br />appear to propose an acreage reduction. <br />Response: <br />The Operator understands that the map submitted in 1998 does not match the original <br />Permit boundary and that disturbance has occured outside of the original permit boundary. The <br />Operator proposes to modify the Affected Area boundary to encompass all site disturbance and <br />reclamation areas. The Operator will coordinate with Division staff to determine the most <br />effective manner to resolve the boundary revision matter. <br />The Operator wishes to note and emphasize that the east dump toe had encroached on the <br />drainage thalweg by the time that the July 1997 Inspection was conducted. The July 1997 <br />Inspection coincided with the transferred receipt of the Permit to the current Operator. The <br />expansion of the dump beyond the original Permit boundary and its encroachment on the east <br />2 <br />