My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33897
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33897
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:38 PM
Creation date
11/23/2007 7:45:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
12/21/1999
Doc Name
Proposed Decision & Findings of Compliance for SL2
From
Partial Phase II 319.5 acres
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Procedures followed in Bond Release Submittal <br />The application for SL-02 follows the bond release procedures described in the Ac[. The application <br />also utilizes the recommendations for bond release applications provided in the Division's bond <br />release Guideline. The bond release application requests only a release of Phase II liability from <br />reclamation work; the application does not request a reduction in the dollar amount of the bond. <br />Contents of this Document <br />This document contains the fol]owing four parts: l) introduction, 2) chronology of past bond releases <br />and the review of SL-02, 3) observations and findings of the Division regarding compliance with <br />the bond release requirements of the Act and the Regulations; and 4) the Division's proposed <br />decision on the request for bond release. <br />II. CHRONOLOGY OF PAST BOND RELEASES AND THE REVIEW OF SL-02 <br />Previous Bond Releases at the Traaaer Mine <br />The following liability and bond releases have occurred at the Trapper Mine. <br />Craig Generation Station Loadout Liability Release. The Division approved an <br />application for liability release in December 1985 covering the Craig Generation Station <br />Loadout. No bond was released. <br />SL-Ol Phase I Bond Release. The Division approved a Phase I bond release application on <br />September 9, 1996 covering 25l 1.7 acres. The release was for liability for backfilling, <br />grading, and drainage reestablishment. The bond amount was not reduced. <br />SL-01 Phase II Bond Release. On December 14, 1998, the Division approved Phase II <br />release for 1570.5 acres in the area that previously underwent Phase I release. Phase II <br />release was for liability for topsoil replacement, revegetation success, and sedimentlerosion <br />control. The bond amount was not reduced. <br />SL-02 Submittal Date, NotiPcations, and Completeness of the Application <br />Trapper submitted the SL-02 bond release request (application) to the Division on October 6, 1999. <br />Trapper published notice of the bond release application in the Craig Daily Press once weekly for <br />four consecutive weeks beginning on September 16, 1999. As required by Section 3.03.2(1), <br />Trapper also notified landowners within and adjacent to the mine permit area and other interested <br />parties. The Division found the application complete on October 18, 1999, after the Division <br />received proof of publication of the applicant's public notice. <br />Trapper Mine <br />Phase II Bond Release Page 2 12/23/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.