Laserfiche WebLink
<br />Stipulation No. ~ <br /> <br />Topsoil must be analyzed for Fertilizer elements prior to seeding. <br />If the soil is found to be phosphorous-Deficient, phosphorous must <br />be incorporated into the topsoil during the respreading process. <br />Arty other fertilizer elements which are deficient in the topsoil may <br />be added after oae year's groxth of vegetation at a time of year <br />approved by the Division. <br />Status: Has been retained by MLRD as stipulation /j'7 on state permit <br />renewal # C-81-020, approved on January 12, 1988. <br />Stipulation No. 8 <br />Within one year of permit issuance, the permittee will submit a plan <br />to the regulatory authority for surface manipulation of the soils to <br />enhance moisture retention and reduce erosion during reclamation. <br />This plan will be reviexed by the Division and initiated by the <br />permittee during reclamation. <br />Status: Was resolved in letter dated January 17, 1986 from company to <br />MLRD <br />Stipulation No. 9 <br />The permittee shall resample the Munger Canyon big sagebrush <br />community for production during the 1983 8roxing season. The <br />sampling shall be of an intensity to meet sample adequacy <br />requirements of the Division. The results of the sampling shall be <br />submitted to the regulatory authority no later than 30 days after <br />the completion of sampling and before September 30, 1983. <br />Status: Was resolved in letter dated January 17, 1986 from Company to <br />MLRD <br />Stipulation No. 10 <br />The permittee shall submit to the regulatory authority a <br />demonetratioa of the repreaeatativeneae of the vegetative sampling <br />for the vegetative commuaitiea at the Munger Canyon site. This <br />demonetratioa shall address rainfall amount sad seasonality for the <br />year of vegetation sampling sad the tvo previous years end compare <br />this information t to mean precipitation amounts and seasonality for <br />the location. This demonstration shall be submitted 60 days after <br />permit issuance. <br />Status: Wea declared satisfied in the September 24, 1985 MLRD "Proposed <br />Decision and Findings of compliance" document for approving a facilities <br />revision. <br />Stipulation No.. 11 <br />The permittee shall supply the regulatory authority xith woody plant <br />density data for all sampled communities to include, but not be <br />limited to, sample size, sample mean, sample variance, and level of <br />confidence achieved. If sampling adequacy is not met, the permittee <br />will be required to resample as necessary during the 1982 growing <br />season. This information shall be provided to the Division within <br />30 days of permit isauaace. <br />