Laserfiche WebLink
~ 1 <br />Mid-Term Review 3 November 27, 1985 <br />Section II -Revisions to Permit <br />The following section lists each approved revision made subsequent to permit <br />issuance (July 27, 1981) and describes what specific text and map changes need <br />to be made by Western Fuels and incorporated into the permit application in <br />order to bring the permit application up to date. Minor Revisions are <br />designated; MR(#), Technical Revisions; TR(#) and Permit Revisions; PR(#). <br />MRO1 - Install Radio Repeater - August 4, 1981 Request <br />Revise Map No. 11, Surface Facilities Index Map, to show location of <br />repeater. Also revise Section III.C. of text to include this additional <br />auxiliary facility. The reclamation plan portion of the text should be <br />amended to describe the removal and reclamation of the facility as well. <br />MR02 - Construct Temporary Pond - September 8, 1981 Request <br />If this pond has been reclaimed in accordance with the comments contained in <br />Deserado's January 18, 1982 letter to the Division, no changes to the permit <br />application need to be made. <br />MR03 - Temporary Stockpiling of Refuse - September 25, 1981 Request <br />The 5,000 cubic yard stockpile of refuse has been moved to the permanent <br />refuse disposal area. Therefore, no changes to the permit application need to <br />be made. <br />-MR04 - D-Portal Earth Embankment Extension - November 25, 1981 Request <br />Revise Map 27 (revision No. 4 at the time of the request) to show <br />configuration of extended fill embankment. The backfilling of this additional <br />fill upon termination of operations should be described in the reclamation <br />plan portion of the text. <br />- Temporary Access Road Construction-Alluvial Well Area - December 4, <br />ues <br />Please refer to your letter dated December 4, 1981. It is unclear from <br />information contained in the Division files whether this road has been <br />reclaimed. Please clarify. Additionally, Map 91 needs to be revised to show <br />the present road configuration. The letter states that the Alluvial Well Road <br />was relocated, which is not reflected by Map 91. It appears from the wording <br />of the letter that both Maps 90 and 91 need to be revised to show the as-built <br />configuration of the access road. Also, it is unclear as to whether the <br />"Alluvial Well Road" is a permanent road differing from the temporary access <br />road requested in the letter. The reclamation plan portion of the text should <br />be amended to describe the removal and reclamation of this road segment. <br />MR06 - Disposal of Excess Cut Material - December 21, 1981 Request <br />The following maps and drawings need to be revised in accordance with the <br />recommendations contained on pages 3, 4 and 5 of Western Fuels December 21, <br />1981 letter to the Division requesting the revision. As-built maps will <br />suffice. <br />