~ 1 <br />Mid-Term Review 16 November 27, 1985 <br />Maps 43, 44 and 46 (Revision D) showing the location of each of the three <br />proposed check dams along Scullion Gulch. A minor revision request was <br />received on May 27, 1982 indicating that the three dams had been installed and <br />requesting that the Division allow the dams to be left in place. It was <br />unclear from the wording of the request, however as to whether Western Fuels <br />wanted the dams left in place permanently or only until final reclamation of <br />the D-Portal area has been completed. Western Fuels should clarify the nature <br />of the request. Additionally, the Operation's Description (p. IV-74a) and <br />Reclamation Plan portion of the application need to be revised to describe the <br />structures and provide a description of how the check dams will function with <br />respect to the overall reclamation plan for the D-Portal area. Section V-B of <br />the application should be revised as well. <br />Stipulation No. 14 <br />THE APPLICANT MUST PROVIDE THE REGULATORY AUTHORITIES WITH PLANS TO RESIZE THE <br />D-PORTAL AREA AND DP-1 PRINCIPAL SPILLWAY TO ALLOW A MAXIMUM HEAD OF ONLY ONE <br />FOOT ABOVE THE RISER CREST UR PROVIDE ADDITIONAL FREEBOARD BETWEEN THE RISER <br />CREST AND EMERGENCY SPILLWAY CREST. 7HE REVISED PLAN SHOULD BE SUBMITTED <br />WITHIN 90 DAYS OF PERMIT APPROVAL. <br />Western Fuels adequately responded to the requirements of this stipulation on <br />October 23, 1981 by submitting two copies of Map 34, Revision C and two copies <br />of revised page 10 of Illustration 7. The information submitted provides for <br />1.2 feet of freeboard between the principal and emergency spillways. <br />Stipulation No. 15 <br />WITHIN 30 DAYS OF PERMIT APPROVAL, THE APPLICANT SHALL COMMIT TO THE <br />REGULATORY AUTHORITY TO COMPLY WITH THE FOLLOWING REQUIREMENTS: <br />(a) TO IMPLEMENT SEDIMENT CONTROL MEASURES PRIOR TO THE ONSET OF CONSTRUCTION <br />OF THE COAL TRANSPORT AND STORAGE AREA: <br />(b) TO PROVIDE EMERGENCY AND PRINCIPAL SPILLWAY OUTLETS WITH APPROPRIATE <br />EROSION CONTRQL PRIOR TO THE CONSTRUCTION OF SEDIMENT PONDS; <br />(c) TO PROVIDE BAFFLES ON EACH OF THE REFUSE DISPOSAL AREA SEDIMENT PONDS AS <br />NECESSARY; <br />(d) TO PROVIDE QUARTERLY REPORTS TO REGULATORY AUTHORITIES AS REQUIRED BY <br />RULE 4.05.9(8) OF THE COLORADO REGULATORY PROGRAM; <br />(e) TO NOTIFY THE REGULATORY AUTHORITIES WITHIN FIVE DAYS AFTER ANALYTICAL <br />RESULTS OF SURFACE WATER SAMPLES INDICATE THAT NONCOMPLIANCE WITH PERMIT <br />CONDITION OR APPLICABLE STANDARD HAS OCCURRED, AS REQUIRED BY RULE <br />4.05.13(2)(a)(ii) OF THE COLORADO REGULATORY PROGRAM; <br />(f) TO REVEGETATE THE ALLUVIAL WELL FIELD ACCESS ROAD TOPSOIL STOCKPILE AS <br />SOON AS PRACTICAL AND MAINTENANCE OF A COLLECTOR DITCH AND BERM AT THE BASE OF <br />THE PILES TO TRAP SEDIMENT UNTIL THIS REVEGETATION IS ACCOMPLISHED; AND <br />