My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33622
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33622
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:30 PM
Creation date
11/23/2007 7:41:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
General Documents
Doc Date
10/3/1984
Doc Name
Letter & Draft Findings
From
MLRD
To
Storm King Mines, Inc
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />19 <br />XV. Exolosives - Rules 2.05.3(b) and 4.08 <br />The section on use of exp]osives in Section 4 of Volume I of the permit <br />application was reviewed for compliance. <br />The applicant proposes to conduct limited blasting operations during <br />construction of the the portal face-up, site preparation for the facilities, <br />at the borrow area for construction of the coal processing waste embankment <br />and along the rail spur and haul road. <br />The applicant submitted a general blasting plan which lacks sufficient detail <br />for approval. The following information is necessary before the Division can <br />approve any biasing: <br />Requirement No. 8 <br />THE APPLICANT MUST SUBMIT A DETAILED BLASTING PLAN TO THE DIVISION AND <br />OBTAIN DIVISION APPROVAL IN WRITING. THE DETAILED BLASTING PLAN MUST <br />CONTAIN, BUT NOT BE LIMITED T0: <br />1) A PROPOSED BLASTING SCHEDULE PUBLICATION. <br />2) AN INVENTORY OF ALL STRUCTURES WITHIN ONE-HALF MILE OF THE PROPOSED <br />BLASTING AREA. <br />3) A COPY OF THE PROPOSED BLASTING RECORDS SHEET. <br />4) A DETAILED DESCRIPTION OF THE BLASTING PATTERN, CHARGE AND PACKING <br />OF HOLES, TYPE OF FUSES AND DETONATION, AND SEQUENCE AND TIMING OF <br />FIRING. <br />In addition, in order to aid the Division in tracking commitment in the <br />permit, the following stipulation is necessary: <br />Stipulation No. 8 <br />PRIOR TO CONDUCTING ANY BLASTING OPERATIONS, THE PERMITTEE WILL CONDUCT <br />THE NECESSARY PRE-BLASTING SURVEYS AS PRESENTED ON PAGES 4-63 AND 4-63a <br />OF VOLUME I OF THE APPROVED PERMIT APPLICATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.