Laserfiche WebLink
1: <br />zo <br />XVI. Backfilling and Grading - Rules 2.05.2 (6)(b),_2.05.4(2 <br />The permit application includes a discussion of backfilling and grading on <br />page 4-70. <br />The surface facilities to be constructed will be Tocated on a gently sloping <br />area containing only small ephemeral drainages. Minimal cut and fill work <br />will therefore be required. This will mean also that minimal grading will be <br />required during reclamation. <br />The proposed operation is in compliance with the requirements of this section. <br />