My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33506
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33506
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:27 PM
Creation date
11/23/2007 7:39:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980110
IBM Index Class Name
General Documents
Doc Name
EXHIBIT D MINING PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,~ <br />• <br /> <br /> <br />~ 10. Sloping - A minimum 3 to 1 slope shall be left to a depth <br /> of 10 feet below water level, and 2 to 1 thereafter to <br /> the bedrock floor. The floor of the pit will be left in <br /> a level condition. <br />~ 11. Excavation Limits - Along all sides of the property exca- <br /> vation shall not take place within 25 feet of the property <br /> line. Twenty-five feet will not disturb the existing <br /> ditches on the south or north sides. This excavation will <br />• ~ <br />come within 125 feet of the Plowman~s structures on the <br /> south. However, since Mr. Plowman is one of the purchasers <br /> of the property, by participating in the conditionsl use ' <br /> request he is granting permission to come this close iAdams <br />~ County prohibits mining within 125 feet of a residence with- <br /> out permission). This 25 foot area amounts to 3.1 acres. <br /> In addition, along both Nome Street and 132nd an additional <br /> 75 feet will not be mined but only graded to fit final con- <br />~ tours in order to provide stability for homesite construc- <br /> tion and septic tank installation. This additional 75 feet <br /> amounts to just over 4 acres. A total of approximately 7+ <br /> acres will be left undisturbed or receive minor disturbance. <br />• <br /> 12. Estimated Development Schedule and Other Data - Projected <br /> to begin in 1985-86 upon completion of the property to the <br /> south. <br />~ Total Acres to Estimated <br /> Time Acres be Mined Tons . <br /> Phase I - 12-18 months 13.2 9.2 920,000 <br /> Phase II - 6-9 months 9.2 6.5 650,000 <br />~ Phase III - 10-14 months 9.4 8.6 860,000 <br /> Phase IV - 12-18 months 12.9 10.7 1,070,000 <br /> 42-60 months 42.7 35.0 3,500,000 <br />~ The above is an estimate only, as market conditions will de- <br /> termine sales. <br />13. Other Standards - All the operations shall comply with noise <br />vibration, safety, air emissions, and other standards re- <br />~ quired by relevant County, State, and Federal laws, rules, <br />and regulations. Where there is an overlap between such, <br />the more restrictive shall govern. <br />• 14. Water Impoundment or Diversion - No impoundment or diver- <br />sion of water will be required for development of this mine. <br />No dewatering will be undertaken. <br /> <br />C: <br />
The URL can be used to link to this page
Your browser does not support the video tag.