Laserfiche WebLink
<br />Phasinc and Disturbance <br />• <br />Of the total 42.75 acres of property only 35 acres will actual- <br />ly be mined because of planned for setbacks. The remaining 35 <br />acres will be mined in four phases starting in the northeast <br />~ corner of the property, then proceeding in a semi-circle to the <br />southwest corner of the property. Approximately 10 acres maxi- <br />mum will be in a state of disturbance at any one time, with <br />major disturbance encompasing 2.5 acres, moderate 5 acres, and <br />~ minor 2.5 acres. ' <br />Prior to beginning mining the property will be enclosed with a <br />6 foot chain link fence with one gate. Next the office trailer, <br />scale house, crusher, etc. will be set up. All these facilities <br />~ will be placed on the north edge of Phase IV, approximately <br />550-600 feet south of the intersection of 132nd and Nome. <br /> The areas of Phases I and II have the greatest amount of over- <br /> burden (2-7 feet) and least aggregate (35 feet). Phase I will <br />~ begin in the northeast corner of the property. Topsoil and <br /> sandy clay overburden will be stored within 100 feet of 132nd; <br /> rejected materials will be utilized to backfill lake areas 100 <br /> 0 <br />feet in from 132nd Avenue. In addition, an average of 6 feet of <br />~ reject material and soils will be used to raise the elevation of <br /> property along US 85 and the south property line. This area will <br /> then be revegetated with screen planting. Once Phase I is approxi- <br /> mately two-thirds mined, stripping of topsoil will begin on Phase II. <br />~ Phase II topsoil will be stored within 100 feet of 132nd and Nome <br /> Street, and as Phase I mining is completed, Phase II mining of <br /> aggregate will be undertaken. eackfilling will continue with re- <br /> jected material along Nome Street and 132nd Avenue beginning 100 <br />~ feet back from each road. As the desired distance, sloping and <br /> elevation is attained, topsoil and clayey soils will be placed over <br /> the rejected material, taking care to insure topsoil is placed <br /> on the surface, then this area will be revegetated. Any excess <br />~ soils will be placed along Nome in piles which will be temporari- <br /> ly revegetated. Thus areas along 132nd will be the first portions <br /> of the property reclaimed to final contours, sloping and revegeta- <br /> tion. <br />• <br /> phase III contains an average of 3-5 feet of overburden and 47 <br /> feet of aggregate. Mining will continue into Phase III as Phase <br /> II is completed. Along US 85 rejected materials will begin to <br /> be placed approximately 25 feet back from the eastern fence line, <br />~ <br /> then contouring and revegetation will be undertaken as Phase III <br /> rnntinues. After areas along US 85 are reclaimed, areas along <br /> the south property line will be reclaimed. Thus the property <br />I• <br />• <br /> <br />