My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33488
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33488
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:26 PM
Creation date
11/23/2007 7:39:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
General Documents
Doc Date
6/1/1984
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE for PR1
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-3- <br /> <br />B. THE OPERATOR WILL MAKE QUARTERLY INSPECTIONS OF THE SEDIMENT POND IN <br />ORDER TO ASSURE THE OPERABILITY OF THE DISCHARGE STRUCTURES AND <br />STABILITY OF THE EMBANKMENT. <br />STIPULATION N0. 3 <br />THE OPERATOR WILL MONITOR EFFLUENT FROM THE SEDIMENT POND AT THE PROPOSED <br />REFUSE DISPOSAL SITE FOR 7HE FOLLOWING PARAMETERS: <br />FLOW pH <br />Total suspended solids Total dissolved solids <br />Electro-conductivity Ca <br />Mg K <br />Na SAR <br />F1 So <br />Al Cr <br />Cu Fe <br />Mn Cl <br />C03 HC03 <br />MONI70RING DATA WILL 8E SUBMITTED 70 THE DIVISION QUARTERLY. <br />STIPULATION N0. 4 <br />BEFORE PLACEMENT OF 7HE CHANNEL LINING, THE OPERATOR MUS7 7ES7 THE ROCK <br />MATERIAL SELECTED ACCORDING TO ACCEPTED ASTM STANDARDS FOR RIPRAP <br />SUITABILITY: THESE RESULTS SHOULD BE SUBMITTED TO THE DIVISION. <br />CERTIFICATION BY A QUALIFIED ENGINEER IS REQUIRED FOR THE FOLLOWING: <br />A. FINAL GRADE AND ALIGNMENT OF THE RELOCATED CHANNEL; AND, <br />B. PROPER SIZING OF RIPRAP AND GRANULAR FILTER ALONG WITH APPROPRIATE <br />THICKNESS AND PLACEMENT OF THESE MATERIALS. <br />THESE CERTIFICATIONS MUST BE SUBMITTED TO THE DIVISION WITHIN 30 DAYS OF <br />FINAL CONSTRUCTION ON THE CHANNEL DIVERSION. <br />STIPULATION N0. 5 <br />THE OPERATOR MUST SUBMIT A PLAN TO DIVERT CHANNEL FLOW (DURING LOW FLOW <br />SEASON) THROUGH DIVERSION DITCHES OR OTHER APPROPRIATE METHOD WITH A SEDIMENT <br />CONTROL PLAN DESIGNED FOR THE TEMPORARY DIVERSION. THE DIVERSION SHOULD BE <br />DESIGNED TO CARRY A MINIMUM FLOW OF lOcfs. THIS PLAN MUST BE SUBMITTED TO THE <br />DIVISION AS A TECHNICAL REVISION 60 DAYS BEFORE CONSTRUCTION IN THE PRESENT <br />CHANNEL BEGINS. <br />STIPULATION N0. 6 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE SHALL ERECT STREAM BUFFER <br />ZONE SIGNS ON ALL AREAS BORDERING THE MIDDLE FORK OF THE PURGATOIRE RIVER <br />'WITHIN AND DIRECTLY ADJACENT TO THE PERMITTED DISTURBED AREA. THESE SIGNS <br />MUST BE ERECTED AT THE EDGE OF THE DISTURBED/UNDISTURBED AREA OR 100 FEET FROM <br />THE EDGE OF THE STREAM, WHICHEVER IS LESS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.