Laserfiche WebLink
<br />-2- <br />PROPOSED DECISION <br />WYOMING FUEL COMPANY <br />THE NEW ELK MINE <br /> <br />The Colorado Mined Land Reclamation Division proposes to approve, with <br />stipulations, an application far a revision to a permit to conduct coal mining <br />operations submitted by Wyoming Fuel Company for the New Elk Mine. <br />The Division is proposing to approve, with stipulations, construction of <br />surface facilities that will allow washing of coal from both the New Elk Mine <br />and Golden Eagle Mine. In addition, the Purgatiore River will be permanently <br />diverted to provide sufficient room for development of the preparation plant <br />facilities, and anew refuse disposal area for permanent disposal of <br />preparation plant refuse will be constructed. All of these activities are <br />covered by this approval. <br />The approval decision is based on a finding that the proposed operations to be <br />approved will comply with all requirements of the Colorado Surface Coal Mining <br />Reclamation Act, C.R.S. 1973, as amended, 34-33-101 et seq. and the <br />regulations promulgated pursuant to the Act. <br />The permit revision application and the stipulations will become a binding <br />part of the permit upon approval. The stipulations for the New Elk Mine <br />permit revision are as follows: <br />STIPULATION <br />PRIOR TO ANY CONSTRUCTION ACTIVITIES FOR THE PROPOSED SEDIMENT POND, WYOMING <br />FUEL COMPANY MUST RECEIVE A WRITTEN NOTICE TO PROCEED FROM THE DIVISION. THIS <br />NOTICE WILL BE PROVIDED ON THE BASIS OF MSHA APPPROVAL OF THE STRUCTURE AND <br />THE DIVISION'S REVIEW OF ALL MATERIALS SUBMITTED TO SECURE MSHA APPROVAL. ALL <br />MATERIALS SUBMITTED 70 MSHA FOR REVIEW SHALL ALSO BE SUBMITTED TO THE DIVISION. <br />STIPULATION N0. 2 <br />THE OPERATOR MUST COMMIT TO THE FOLLOWING MAINTENANCE OF THE SEDIMENT POND: <br />ONLY ONE DEWATERING ORIFICE WILL 8E OPEN AT A TIME. THE FIRST ORIFICE <br />AT THE 2 ACRE FOOT LEVEL WILL BE CLOSED AT SUCH TIME THAT THE SEDIMENT <br />VOLUME REACHES 60X OF THE DESIGN STORAGE OR 1.2 ACRE FEET. AFTER <br />CLOSURE OF THE FIRST ORIFICE, THE SEDIMENT LEVEL WILL BE MAINTAINED AT <br />NO MORE THAT 4G% OF THE 4.95 ACRE F007 DESIGN VOLUME FOR SEDIMENT OR AT <br />APPROXIMATELY THE 2.0 ACRE FOOT LEVEL. STAFF GAGES WILL BE INSTALLED TO <br />ASSURE PROPER DETERMINATION OF SEDIMENT LEVEL. <br />