Laserfiche WebLink
<br />-4- <br />STIPULATION N0. 7' <br /> <br />THE PERMITTEE MUST PLACE A MINIMUM OF ONE F00T OF SUITABLE MATERIAL OVER THE <br />UNDERDRAIN TO FORM A GRANULAR FILTER. THIS MATERIAL SHOULD BE GRADED SIMILAR <br />TO THE GRANULAR FILTER USED BEHIND THE RIPRAP IN THE RELOCATED STREAM CHANNEL <br />AS FOUND IN ADDENDUM E. SECTION 8 OF THE PERMIT REVISION APPLICATION. <br />STIPULATION N0. 8 <br />THE PERMITTEE MUST COMMIT TO PLACING TWO MONITORING WELLS IN THE FILLED <br />CHANNEL; ONE ON THE UPSTREAM END AND ONE ON THE DOWNSTREAM END. THESE WELLS <br />SHOULD 8E COMPLETED IN THE COBBLE AND GRAVEL FILL AND MONITORED MONTHLY FOR <br />WATER LEVEL AND QUARTERLY FOR THE SUITE OF PARAMETERS GIVEN IN STIPULATION N0. <br />3. <br />STIPULATION N0. 9 <br />DURING PREPARATION OF THE SITE OF THE REFUSE DISPOSAL AREA ALL SOIL <br />MATERIAL MUST BE SALVAGED DOWN TO BEDROCK. THESE MATERIALS MUST eE STOCKPILED <br />IN A MANNER THAT SEGREGATES THE A AND 8 HORIZON FROM THE C HORIZON. <br />STIPULATION N0. 10 <br />THE PERMITTEE MUST SUBMIT A REVISED VEGETATION SAMPLING PLAN AND METHODOLOGIES <br />TO THE DIVISION FOR APPROVAL. THIS PLAN MUST INCLUDE SAMPLING FOR PRODUCTION, <br />AS WELL AS VEGETATIVE COVER, WOODY PLANT DENSITY, AND SPECIES DIVERSITY. <br />DURING SAMPLING THE PERMITTEE MUST EVALUATE THE POTENTIAL FOR IMPACTS TO RARE <br />AND ENDANGERED PLANT SPECIES IF IDENTIFIED DURING THE SURVEY. <br />STIPULATION N0. 11 <br />THE PERMITTEE MUST LOCATE THE PROPOSED REFERENCE AREAS ON A VEGETATION MAP. <br />IN ADDITION I7 MUST BE STATISTICALLY DEMONSTRATED THAT THESE REFERENCE AREAS <br />ARE EQUIVALENT TO OR BETTER THAN THE AREA TO BE DISTURBED IN VEGETATIVE COVER <br />AND PRODUCTION. <br />STIPULATION N0. 12 <br />THE PERMITTEE MUST INSTALL CULVERTS IN THE ACCESS ROAD TO THE REFUSE PILE <br />WHICH ARE 6 INCHES LARGER IN DIAMETER THAN THOSE SPECIFIED IN ADDENDUM E OR <br />INSTALL A 1.5 FOOT HEADWALL A80VE CULVERT INLETS. IN ADDITION, THE PERMITTEE <br />MUST JUSTIFY THE USE OF A 0.03 MANNINGS n FOR DITCH DESIGNS OR INSTALL 1.5 <br />FEET DEEP DITCHES ALONG THE REFUSE PILE ACCESS ROAD. <br />STIPULATION N0. 13 <br />SIZING CALCULATIONS FOR THE ACCESS ROAD CULVERT SOUTH OF HIGHWAY 12 MUST BE <br />SUBMITTED WITHIN 30 DAYS OF PERMIT REVISION APPROVAL. <br />