Laserfiche WebLink
<br />In the event that additional bridge plugs do not allow a successful MIT, ASLLP plans to plug <br />both 7" casing strings with cement from the bridge plugs to the surface on wells 29-22 and 20- <br />76. <br />MIT testing remains pending for 5 wells. These wells are currently scheduled to have the 4 Y2" <br />tubing removed and bridge plugs installed by 9-8-04. At present, the MIT's on these wells are <br />scheduled to be complete by 9-10-04 <br />If you have any questions or require more information concerning this matter please <br />contact me at 970-285 -0407, <br />Sincerely, ; <br />Ed Cooley . <br />Health <br />and Safety <br />cc: Kent Walter/BLM <br />Erica Crosby/CDMG <br />