My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33480
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33480
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:26 PM
Creation date
11/23/2007 7:38:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
General Documents
Doc Date
9/1/2004
Doc Name
Mechanical Integrity Tests of Wells 29-22 29-20 29-24 20-31 & 20-76
From
American Soda L.L.P.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
„ ~ / <br />AMERICAN <br />Ed Cooley <br />S O D A, L L P Environmental Health and <br />Safety Manager <br />2717 County Road 215 <br />Parachute, CO 81635 <br />Friday, August 27, 2004 <br />Kent Walter <br />White River Field Office <br />Bureau of Land Management <br />73544 Highway 64 <br />Meeker, Colorado 81641 <br />Direct Line (970) 285-0d07 <br />International Telephone +1 (970) 285-6500 <br />General Facsimile (970) 285-6393 <br />ENV.190.04 <br />Re: AS Well 29-22 UIC Permit No. C03858-04570 <br />AS Well 29-20 UIC Permit No. C03858-04569 <br />AS Well 29-24 UIC Permit No. C03858-04572 <br />AS Well 20-31 UIC Permit No. C03858-04558 <br />AS Well 20-76 UIC Permit No. C03858-04651 <br />Dear Kent: <br />During the performance of mechanical integrity tests of the American Soda Piceance facility <br />wellfield, wells 29-22, 29-20, 29-24, 20-31, and 20-76 failed to pass the minimum requirement of <br />300 psi for 30 minutes with less than a 10% pressure loss. <br />ASLLP is in the process of evaluating the possibility that the cast iron bridge plugs are leaking. <br />On wells 29-22 and 20-76, ASLLP will set additional bridge plugs and retest the mechanical <br />integrity. This procedure should be complete by 9-1-04. <br />ASLLP plans to plug both 7" casing strings with cement from the bridge plugs to the surface <br />on wells 29-20, 29-24, and 20-31. <br />In the event that additional bridge plugs do not allow a successful MIT, ASLLP plans to plug <br />both 7" casing strings with cement from the bridge plugs to the surface on wells 29-22 and 20- <br />76. <br />Delivering a Crystal Clear Advantage <br />www.americansoda.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.