Laserfiche WebLink
<br />Stipulation No. 17 was attached to Technical Revision No. 30 and required the submittal of the NPDES <br />permit, air emissions permits, the Section 7 consultation with the USDA-Forest Service and an agreement <br />from the Deer Trail Ditch Company before coal waste disposal site no. 2 could be constmcted or before <br />there was any discharge from Pond F. Upon submittal of the documentation, Stipulation No. 17 was <br />complied with. <br />Technical Revision No. 31 was approved with Stipulation No. 18 attached. This stipulation required the <br />submittal of a rockfall report and the construction of a rockfall berm above the facilities area before the <br />mine plan change in [he west district could be implemented. Stipulation No. 18 was complied with. <br />Stipulation No. 19 was attached to Technical Revision No. 34 and required the submittal of the necessary <br />air emissions permits before the B-2 coal seam portal bench upland conveyor could be used. The air <br />emissions permits were submitted so Stipulation No. 19 was terminated. <br />Stipulation No. 20 was attached to Succession of Operator No. 2 and required the resolution of one AV S <br />issue before the permit could be transferred from Bowie Resources Limited to Bowie Resources LLC. <br />Stipulation No. 20 was terminated. Also attached to Succession of Operator No. 2 was Stipulation No. 21. <br />This stipulation required proof that the BLM coal leases were transfenred from Bowie Resources Limited <br />to Bowie Resources LLC. Stipulation No. 21 was complied with. <br />Stipulation No. 22 was attached to Field Minor Revision No. 52 and required a permit text revision to <br />reflect that BRL could use a pump on a temporary basis to dewater pond B. With the submittal of the <br />permit text changes, this stipulation was complied with. The use of the pump for pond B became <br />permanent through Technical Revision No. TR-38. The approval of the relocation of one gob vent <br />borehole through Field Minor Revision No. 61 was contingent on the resolution of Stipulation No. 23. <br />This stipulation was complied with when the permit text, map and reclamation cost estimate were <br />submitted. <br />The following are the active stipulations: <br />Stipulation No. 9 <br />A detailed subsidence study for Terror Creek Reservoir dam (Bruce Park dam) must be completed and <br />approved prior to that time when the projected angle of draw of mining is within one mile of the Bruce <br />Park dam. The study will establish baseline conditions, potential mining-induced seismicity and potential <br />translated effects to the dam. <br />Mining with a projected angle of draw that is within one mile of the Terror Creek Reservoir (Bruce Park <br />dam) will not be approved until all necessary monitoring data, analyses, reports and subsidence control <br />plan details are approved by the Division and it is shown that such mining will not adversely impact the <br />dam. <br />Bowie Resources will submit a technical revision to the permit addressing the investigation, data <br />collection, analysis, and monitoring plan to ensure the safety and integrity of the Terror Creek Reservoir <br />dam (Bruce Park dam). The revision materials will include, but not be limited to, data, a technical report, <br />compliance schedules, a subsidence control plan, a detailed monitoring plan specific to potential <br />seismicity and any other potential impacts induced by longwall mining. The Technical Revision shall <br />address: <br />