My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33452
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33452
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:25 PM
Creation date
11/23/2007 7:38:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
6/22/2007
Doc Name
Proposed Decision & Findings of Compliance for RN2
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
x. <br />Townshi~l2 South, Ranee 91 West, 6th PM <br />Sec. 33: Lots 1, 2, 3, 6, 7, 8, 10, l 1, 12, 14, 15, 16, SE'/<NW'/,, S'/zNE'/. <br />Sec. 34: Lots I through 16, S'/zNE''/s, S'hNW'/<, <br />* North of Deer Trail Ditch <br />Proposed Decision <br />The Colorado Division of Reclamation, Mining and Safety proposes to Approve an application for a <br />permit renewal to continue coal mining operations for another five year term. <br />The application was submitted by BRL for the mine. This decision is based on a finding that the <br />operations will comply with all requirements of the Colorado State Program, as found in the Colorado <br />Surface Mining Reclamation Act, C.R.S. 34-33-101 et. seq., and the Regulations promulgated pursuant to <br />the Act. [f no request for a formal hearing is made within thirty (30) days of the first publication of the <br />issuance of this proposed decision, then this decision becomes final. The original permit to conduct coal <br />mining operations was issued on April 4, 1997. The Division is in possession of a reclamation bond in the <br />form of cash and corporate sureties whose combined value is in excess of the amount of the estimated <br />reclamation band liability. <br />The permit renewal application, all supporting documentation and any stipulations or conditions will <br />become a binding part of the permit. <br />The original permit approval contained Stipulations Nos. 1, 2, 3 and 4. All four of these stipulations were <br />complied with when BRL secured the necessary permits and approvals. Stipulation No. 5 was attached to <br />Minor Revision No. 4 and was complied with when BRL performed the required action. Stipulation No. 6 <br />had been attached to Minor Revision No. 5 and was complied with when BRL submitted the required <br />revised maps and permit application text. Stipulation No. 7 was attached to the decision for Permit <br />Revision No. 2, Approval of Permit Revision No. 4 was conditioned on three new stipulations, Nos. 8, 9 <br />and 10. For the approval of Permit Revision No. 5, Stipulations Nos. 7 and 8, and new compliance issues <br />brought up during the review of PR-O5, were combined into a new stipulation, Stipulation No. ] 2. <br />Stipulation No. 12 was modified later for PR-07 and for PR-08. Stipulations Nos. 7 and 8 were, <br />subsequently, terminated. Stipulations Nos. 9 and 10 are still active. Stipulation No. 9 was revised when <br />BRL modified its D-2 coal seam mine plan. However, the stipulation was not terminated in case BRL <br />plans to mine the B-2 coat seam to within one mile ofthe Bruce Park Dam. <br />Stipulation No. 1 1, attached to Field Minor Revision No. 17, was complied with when BRL supplied the <br />required permit text. Stipulation No. 12 involved the Applicant Violator System computer check and was <br />terminated. <br />Stipulation No. 13 was added to the decision for Permit Revision No. 6. Stipulation No. 13 was <br />terminated upon submission of the requested permits. Stipulation No. l4 was attached to the decision for <br />Permit Renewal No. 1 and is still active. Stipulation No. 15 was attached to Technical Revision No. 27 <br />and required the submittal of air emissions permits for the coal preparation wash plant. Upon submittal of <br />the air emissions permits, Stipulation No. I S was complied with. Stipulation No. 16 was attached to TR- <br />30 and required a geotechnical report showing that the factor of safety for gob pile no. 2 was LS or <br />greater. When BRL failed to submit the required geotechnical report, Notice of Violation CV-2005-002 <br />was issued and Stipulation No. 16 was terminated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.