Laserfiche WebLink
-83- <br />XVIII. Mine Facilities, Coal Handling Structures, Support Facilities - Rules <br />2.05.3(3), 2.05.3(7), and 4.04 <br />The mine facilities, support facilities and coal handling structure portions of the <br />application can be found on pages 2.05-18 through 2.05-21 of the Bear No. 3 application. <br />Surface facilities at the proposed Bear No. 3 will include office and shop facilities, <br />crusher, coal stockpile and truck dump. Rail loadovt facilities will not be constructed. <br />Coal will be hauled by truck from the mine site to a Zoadout site in Delta. Existing <br />facilities, including the loadout, at the Bear No. 1 and No. 2 will be removed as a <br />part of reclamation durinq_ the su7mrter of 1982. <br />STIPULATION N0. 13: <br />WITHIN ONE MONTH OF PERMIT ISSUANCE, AN OPERATION DESCRIPTION, A SEDIMENT CONTROL <br />PLAN, AND A RECLAMATION PLAN FOR TXE LOADOUT WILL BE SUBMITTED TO THE DIVISION <br />AND INCORFORATED INTO THE PERMIT. <br />