Laserfiche WebLink
-3- <br />5. BEAR COAL COMPANY SHALL CONTINUE TO MONITOR THE THREE NORTH FORK <br />ALLUVIAL WELLS TO MONITOR THE EFFECTS OF MINING ON ALLUVIAL GROUND WATER. <br />THIS MONITORING SHALL INCLUDE MONTHLY MONITORING OF GROUND WATER LEVELS, <br />pH, TEMPERATURE AND ELECTRO~ONDUCTIVITY. ON A QUARTERLY BASIS, <br />GROUND WATER QUALITY ANALYSES SHALL BE RUN ON SAMPLES COLLECTED FROM <br />THESE ALLUVIAL WELLS. THE WATER QUALITY SAMPLES SHALL BE ANALYZED <br />FOR THOSE PARAMETERS IN ATTACHMENT 2 OF THIS DOCUMENT. ALL DATA SHALL <br />BE SUBMITTED TO THE DIVISION WITHIN ONE MONTH OF THE DATE OF <br />COLLECTION. THE DIVISION MAY REDUCE THIS FREQUENCY OF ANALYSIS, THE <br />NUMBER OF PARAMETERS ANALYZED, RND NUMBER OF WELLS MONITORED UPON <br />COMPLETION OF ONE YEAR 's COLLECTION OF DATA. <br />6. THE PERINITTEE WILL SUBMIT TO TXE DIVISION AN ANNUAL HYDROLOGIC <br />REPORT, THIS REPORT SHALL INCLUDE AN ANALYSIS OF ALL HYDROLOGIC <br />DATA GATHERED DURING THE YEAR, AN ASSESSMENT OF THE IMPACTS OF <br />MINING DURING THE YEAR, AND AN ASSESSMENT OF THE PROJECTED IMPACTS <br />OF MINING IN THE FOLLOWING YIiAR. THIS REPORT SHALL ASSESS THE IMPACTS <br />OF MINING ON THE QUALITY AND QUANTITY OF WATER IN SURFACE STREAMS, <br />SPRINGS, GROUND WATER AQUIFERS, MINE INFLP.^1, AND MINE DISCHARGES. <br />7. THE PERMITTEE WILL SUBMIT, WITHIN ONE MONTH OF PERMIT APPROVAL, A <br />GOLDEN EAGLE SURVEY PLAN FOR APPROVAL BY THE DIVISION IN CONSULTATION <br />WITH THE U.S. FISH AND WILDLIFE SERVICE. THIS PLAN WILL DESCRIBE A <br />SURVEY DESIGNED TO DETERMINE IF THE KNOWN GOLDEN EAGLE NEST NEAR THE <br />BEAR NO. 3 PORTAL WAS ACTIVE IN 19B 2, AND WHETHER THERE ARE ANY <br />ALTERNATIVE GOLDEN EAGLE NESTS IN THE AREA. THE SURVEY WILL BE <br />CONDUCTED WITHIN ONE MONTH OF PERMIT ISSUANCE, RND RESULTS WILL BE <br />SUBMITTED TO THE DIVISION TO DETERMINE IF A MITIGATION PLAN IS <br />NEEDED. <br />8, THE DIVISION DIRECTS BEAR COAL COMPANY TO SUBMIT, FOR REVIEW AND <br />APPROVAL BY THE DIVISION, PROP0.SED LOCATIONS AND CONSTRUCTION <br />SPECIFICATIONS FOR THE THREE FfONITOR STATIONS TO BE INSTALLED UPON <br />THE BACKFILLED MATERIAL AT THE BEAR NO. 2 PORTAL AREA. IMMEDIATELY <br />FOLLOWING THE COMPLETION OF BACKFILLING AND GRADING OF THE BEAR <br />NO. 2 PORTAL AREA, THESE THREE A10NITORING STATIONS SHALL BE <br />INSTALLED AS SPECIFIED AND SURVEYED. SURVEYING OF THESE STATIONS <br />SHALL BE REPEATED ON A SEMI-ANNUAL BASIS FORA PERIOD OF TWO YEARS. <br />RESULTS OF THE SURVEYING OF TE!ESE STATIONS SHALL BE SUBMITTED TD <br />THE DIVISION WITHIN 30 DAYS FOLLOWING COMPLETION OF THE SEMI- <br />ANNUAL SURVEY. IF MONITORING OF THE BACKFILLED AREA DETECTS MOVE- <br />MENT, WHICH THE DIVISION DETERMINES TO REPRESENT AN INDICATION OF <br />IMMINENT HAZARD, THE BEAR COAT, COMPANY SHALL EXPEDITIOUSLY DEVELOP <br />AND IMPLEMENT, FOLLOWING THE b2VISION'S APPROVAL, A PLAN TO MITIGATE <br />THAT HAZARD AND TO STABILIZE THE BACKFILLED AREAS. <br />9. THE DIVISION DIRECTS BEAR COAL COMPANY TO PERFORM PROCTOR TESTING <br />TO DETERMINE THE MOISTURE-DENSITY RELATIONSHIPS OF THE MATERIALS TO <br />BE UTILIZED IN BACKFILLING THE BEAR NO. 1 AND NO. 2 MINE PORTAL <br />AREAS. IN CONFORMANCE WI4'H TffE RECOMMENDATIONS OF ROCKY MOUNTAIN <br />GEOTECHNICAL, INC., THE 1~1ATERIAZS SHALL BE PLACED AND COMPACTED <br />TO ACHIEVE 95e OF THE MAXIb1UM PROCTOR DENSITY, AS DETERMINED IN <br />ACCORDANCE WITX ASTM STANDARD TEST D-698. FURTHER, BEAR COAL COMPANY <br />SHALL SUBMIT A CERTIFIED INSPECTION REPORT TO VERIFY COMPLETION OF <br />BACKFILLING AND GRADING OF THE BEAR NO. I AND NO. 2 MINE PORTAL AREAS <br />IN CONFORMANCE WITH THE APPROVED PLAN. THIS CERTIFIED REPORT SHALL <br />BE PREPARED BY A QUALIFIED REGISTERED PROFESSIONAL ENGINEER OR <br />PROFESSIONAL GEOLOGIST. T!!E REPOP.T SHALL BE SUBMITTED TO THE D2VIS20'1 <br />WITHIN 60 DAYS OF THE COMPLETION OF BACKFILLING AND GRADING. <br />