My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33122
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:16 PM
Creation date
11/23/2007 7:31:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
General Documents
Doc Date
3/31/1982
Doc Name
PROPOSED DECISION and FINDINGS OF COMPLIANCE
From
Mine No. 1, No. 2 & No. 3
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-4- <br />10. THE DIVISION DIRECTS BEAR COAL COMPANY TO SUBMIT A DETAILED ENGINEERING <br />PLAN FOR THE PORTAL ACCESS ROAD AND PORTAL FACILITIES RT THE BEAR NO. <br />3 MINE, FOR REVIEW AND APPROVAL BY THE DIVISION, NO LATER THAN 30 DAYS <br />FOLLOWING APPROVAL OF THE PERMANENT PROGRAM PERMIT. THIS DETAILED <br />ENGINEERING PLAN SHALL INCLUDE ROAD AND PORTAL CROSS-SECTIONS, ROAD AND <br />PORTAL PLAN AND GRADE DESIGN DRAWINGS, AND DETAILED ENGINEERING <br />DESIGN DRAWINGS FOR ALL RETAINING STRUCTURES AND DRAINAGE FACILITIES, <br />NO ADDITIONAL DISTURBANCE SHALL OCCUR IN TXE AREA OF THE PORTAL ACCESS <br />ROAD OR PORTAL FACILITIES UNTIL THESE DETAILED ENGINEERING PLANS HAVE <br />BEEN REVIEWED AND APPROVED BY THE DIVISION. <br />I1. THE DIVISION DIRECTS BEAR COAL COMPANY TO SUBMIT THE LOCATIONS AND <br />CONSTRUCTION SPECIFICATIONS FOR MONITORING FACILITIES, DESIGNED <br />TO MONITOR THE STABILITY OF TXE PORTAL ACCESS ROAD AND PORTAL <br />FACILITIES AT THE BEAR NO. 3 MINE. THESE MONITORING FACILITIES <br />SHALL CONSIST OF APPROPRIATELY LOCATED TILT METERING AND LOCATION <br />MONITORING FACILITIES. THESE FACILITIES SHALL BE DESIGNED TO <br />MONITOR BOTH THE OPERATIONAL AND RECLAIMED CONFIGURATIONS OF THE <br />PORTAL ACCESS ROAD AND PORTAL FACILITIES. INSTALLATION OF THESE <br />MONITORING FACILITIES SHALL OCCUR AS IMMEDIATELY FOLLOWING <br />CONSTRUCTION IN THE PORTAL ACCESS ROAD AND PORTAL FACILITY AREAS <br />AS IS FEASIBLE. MONITORING SHALL COMMENCE IMMEDIATELY FOLLOWING <br />INSTALLATION AND CONTINUE ON A SEMI-ANNUAL BASIS UNTIL TWO YEARS <br />FOLLOWING COMPLETION OF THE RECLAMATION OF THE PORTAL ACCESS ROAD <br />AND PORTAL FACILITY AREA. RESULTS OF THE SEMI-ANNUAL MONITORING <br />SHALL BE SUBMITTED TO THE DIVISION WITHIN 30 DAYS FOLLOWING <br />COMPLETION OF THAT SEMI-ANNUAL MONITORING. IF THE MONITORING OF <br />THESE FACILITIES DETECTS ANY IMMINENT HAZARD, IN TXE OPINION OF <br />THE DIVISION, BEAR COAL COMPANY SHALL EXPEDITIOUSLY DEVELOP AND <br />IMPLEMENT, FOLLOWING DIVISION APPROVAL, A PLAN TO MITIGATE THAT <br />HAZARD AND TO STABILIZE THE AFFECTED SLOPE. <br />12, WITHIN ONE MONTH OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT A PLAN <br />TO THE DIVISION FOR PLACEMENT AND STORAGE OF A_LL NON-COAL WASTES IN A <br />DESIGNATED PORTION OF TXE PERMIT AREA TO ENSURE THAT LEACHATE AND <br />SURFACE RUNOFF DO NOT DEGRADE SURFACE OR GROUND WATER. A PLAN FOR <br />FINAL DISPOSAL OF NON-COAL WASTES IN A DESIGNATED DISPOSAL SITE WILL <br />AL40 BE SUBMITTED. <br />13. WITHIN ONE MONTH OF PERMIT ISSUANCE, AN OPERATION DESCRIPTION, A <br />SEDIMENT CONTROL PLAN, AND A RECLAMATION PLAN FOR THE LOADOUT WILL <br />BE SUBMITTED TO TXE DIVISION AND INCORPORATED INTO THE PERMIT. <br />I4, WITHIN TWO MONTHS OF PERMIT ISSUANCE, THE PERMITTEE WILL SUBMIT <br />TO THE DIVISION AN ACCEPTABLE PLAN FOR SNOW REMOVAL AND DISPOSAL, <br />TO INSURE THAT SNOW AND ROAD SURFACING MATERIAL IS DISPOSED OF IN <br />RN APPROPRIATE AREA, AND DOES NOT INTERFERE WITH SURFACE DRAINAGE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.