Laserfiche WebLink
17. Stipulation: THE DES'I GiJS AND LOCA TIO,VS' OF ALL MO,VI TOR WELLS SHALL BE PROVIDED <br />TO THE DIVISION WITHIN 30 DAYS OF THE PERMIT ISSUING. EACH MONITORING WELL <br />INSTALLED SUBSEQUENT TO THE PERPIIT ISSUING SHALL BE DESIGNED SUCH THAT EACH <br />AQUIFER CAN BE MEASURED AND SAMPLED LJI THIN THE BOP.E HOLE. THE APPLICANT SHALL <br />,SUBMIT TO THE OI VISIO,V A COMPLETION REPORT FOR EACH NEW WELL WHEN SUBMITTING <br />~;'F- THE FIRST QUARTER'S DATA COLLECTED FOR EACH WELL. <br />t <br />~~ MLRD Findings Zbcument: Stipulation No. 16, p. 16 <br />.. f <br />~ OSM Findings Document: Stipulation IJO. 19, p. 7 as follows: <br />19. The designs and locations of aZl monitor wells shall be provided to the <br />regulatory authority within 30 days of the permit issuance. Each ma~itor- <br />ing well installed subsequently shall be designed to sample one geologic <br />unit. The applicant shaZ1 submit to the regulatory authority a completion <br />report for each new well. All monitor wells shall be monitored for water <br />levels monthly and water quality on a quarterly basis for the duratiofi of <br />the 1-year base-line data collection period. All data shall be submitted <br />to the regulatory authority quarterly. <br />NOTE: The second part of OSM Stipulation 19 is the same as MLRD Stipulation No. 2I <br />of this memo. <br />OSM TEA: Stipulation No. 11 (listed as No. 2 under Section 8I7.52(aJ), p.34 <br />as follows: <br />11. Stipulation 2: The designs and locations of alI monitor wells shall be <br />provided to the requlatory authority. Each well must be designed to <br />sample only a single geologic unit and the interval sampled by each well <br />should be specified. <br />18. Stipulation: WITHIN' 3 PiONTHS OF DIVISION APPROG'AL OF THE APPL CATI CO CCAL <br />SHALL JUSTIFY THE USE OF THE P OPOSED SHRUB ENSI Y ~~'S~LLLLU~~~~C~~-~C~~-~ S R 11 <br />STEMS/ACRE, BY PROV G TR F NDINGS OF T E TE E CSG CE <br />,~ TO ESTABLISH THIS AN RD. F THI~ENS TY ST N A T E EQUA ELY ~~~~~~i <br />f 'JUSTIFIED, THEN TH AP LIC , IN CONSULTA N TH THE DIVISION AND OShf SHALL <br />~`~ , DEVELOP APPROPRIAT , J STI A SHRUB DENSITY SUCCESS STANDARDS TO BE USED IN <br />EVLAUATING RECLAMA O AND ADJUST THE STOCKING DENSITIES FOR EACH SHRUB SPECIES <br />TO BE PLANTED SO AS TO ALLOW MEETING THE ALTERNATIVE STANDARD. <br />MLRD Findings Document: Stipulation No. 30, p. 40 <br />OSM Findings Document: Stipulation ,Vo. 36, P. 10 <br />OSM TEA: Stipulation No. 28 (listed as No. 2 under Section 817.117(D), p. 196 <br />19. Stipulation: ARCO COAL MUST SUBMIT TO THE DIVISION INFORMATION IN SUFFICIENT <br />DETAIL WHICH DEMONSTRATES THAT THE PROPOSED OPERATION IS NOT: <br />1. ON LANDS WITHIN 3U0 FEET MEASURED HORIZONTALLY OF ANY PUBLIC BUILDING, <br />SCHOOL, CHURCH, COMMUNITI' OR INSTITUTIONAL BUILDING OR P BLIC PARK; <br />2. [JITHIN 100 FEET T RED HO IZONTALLI' O~' CEMETERY, <br />' 3. ON ANY FEDERAL NDS 42T TH~OUND IES~ OyF" l),,p,ttaa//auu,,,,I1~~~~^~1In~l 0~1~~1AL EST: <br />4. NOT [/ITHIN 100 FEET, MEA U D HORIZON LLl[„c;~"Ttf U~T,S IGHT-OF-h'AY <br />'• LINE OF A PUBLI RO ; <br />~~' S. NOT WITHIN 300 F MEAT RED HORIZONTALLY FROFI Y OCCUPIED DG/ELLING. <br />[i. THIS INFORMATION h1UST BE INCLUDED IN Th'E PERPIIT APPLICATION AND h1UST BE <br />SUBMITTED TO Th'E DIVISIOIJ NO LATER THAA' OCTOBER 31, 1981. <br />MLRD Findings Document: Stipulation No. 46, p. 48 <br />OSM Findings Cocument: Stipulation No. 43, p. 12 as follows: <br />43, Prior to any construction or surface disturbance to facilitate coal mining <br />within 100 feet of a road right of way, ARCO will receive a variance to <br />do so from the regulatory authority. <br />.~..~..-r.. .,. ,.r .. <br />