My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33119
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:16 PM
Creation date
11/23/2007 7:31:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
10/22/1981
Doc Name
List - complete list of original stipulations
From
MLR
To
FILE NO C-007-80
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHALL BE REVISED TO REFLECT ANY VARIATION FROh1 THE PRELIh17NARY DESIGN <br />ASSUh1PTIONS DETERFIINED DURING Tf1E COMPLETION OF THE PHASE II STUDY. NO <br />WASTE h1ATERIAL SHALL BE DEPOSITED WITHIN THE INITIAL WASTE PILE PRIOR TO <br />COhIPLETZON OF PIIASI I AND PHASE ZZ STUDIES AND THE APPROVAL, BY THE DIVISION, <br />OF THE APPROPRIATE REVISED DETAILED ENGINEERING PLANS FOR THE INITIAL WASTE PILE. <br />MLRD Findings Document: Stipulation No. 33, p. 44 <br />OSM Findings mcument: Stipulation No. 30, p. 9 <br />OSM TEA: Stipulation No. 37, p. 195 <br />14. Stipulation: .aRCO COAL MUST COMPLETE THE PRELIMINARY STABILITY EVALUATION FOR <br />THE UPPER WASTE ROCK PILE DESCRIBED WITHIN PROPOSAL LETTER 3.2.9.B, INCLUDED <br />WITHIN THE REVISED PERMIT APPLICATION. IN ADDITION, ARCO IS DIRECTED TO COMPLETE <br />% A THOROUGH GEOTECHNIC NA~,YSZS AND DETAILED ENGINEERING D SIGN AND PLANS OF <br />` „~~ ~, THE UPPER [/ASTE PIL A H CCESS g11pA,`p THE UPPER WASTE PI ARCO IS <br />~~~~~' % •• DIRECTED TO INCLU E CO ~OOF-THE ~E$~~ HE GEQ~ C~~A~Y~SES AND <br />`~~ [•~'~~~~~. DETAILED DESIGN NAR TIVE S, AND S SECT IN HE PERMIT APPLICATION. <br />„~ - NO CONSTRUCTION SHALL MENCE ON THE ACCESS ROAD OR THE UPPER WASTE PILE UNTIL <br />~~ =~~ APPROVAL, BY THE DIVISION OF THE REQUIRED GEOTHECHNICAL ANA L2'SES AND DETAILED <br />~ ,~''~. <br />1. P ENGINEERING DESIGN. Na.S •~"°[ °"S'ywS ~' SJY V~Y ~"4'wv+--~.J1S p-lj ~~~ C0.'~'r:~ <br />~•„ ~•-i` MLRD Findings Document: Stipulation No. 34, p. 99 <br />''.~„c~ OSM Findings Document: Stipulation No. 31, p. 9 <br />OSM TEA: Stipulation No. 38, p. 195 <br />15. Stipulation: AT LEAST T[JO h10NITORING WELLS SHOULD BE COMPLETED UP DIP OF THE <br />5-YEAR PERMIT AREA AND WITHIN THE F SEAhI PRIOR TO THE OPENING OF PORTALS INTO <br />1 THE F SEA19. THE MONITORING WELLS SHOULD BE MONITORED MONTHLY FOR WATER LEVELS <br />i 1AND QUARTERLY FOR WATER CHEMISTRY. THE DATA GATHERED FROM THE [JELLS SHOULD BE <br />,~~`i" SUBMITTED TO THE DIVISION QUARTERLY AS PART OF THE QUARTERLY HI'DROLOGIC REPORT. <br />.[ , <br />~` MLRD Findings Document: Stipulation No. 14, p. 16 <br />I; <br />OSM Findings Document: Stipulation No. 16, p. 7 as follows: <br />~G'. 16. At least two monitoring wells should be completed up-dip of the 5-year <br />permit area and within the F seam prior to commencement of mining. <br />The monitoring wells should be monitored monthly for water levels and <br />quarterly for water chemistry. The data gathered from the wells should <br />be submitted to the regulatory authority quarterly. <br />OShI TEA: Stipulation No. 12 (listed as No. 3 under Section 8Ii.52(a)), p. 34 <br />as follows: <br />12. Stipulation 3: At least one well in the 5-year permit area or adjacent <br />area should be completed in the F-seam and monitored prior to commencement <br />of mining. <br />I6. Stipulation: THE APPLICANT SHALL INSTALL AND BEGIN ,~10NITORING THE 2 PROPOSED <br />MONITORING [JELLS LOCATED OVER THE FIRST PANEL. TO BE SUBSIDED ONE YEAR PRIOR TO <br />MINING THIS PANEL. THE APPLICANT SHALL SUBh1IT TO THE REGULATORY AUTHORTIS'[dELL <br />COMPLETION REPORTS, A MONITORING SCHEDULE, GROUND WATER LEVEL DATA AND WATER <br />QUALITY DATA PRIOR TO MINING THIS PANEL. <br />MLRD Findings Document: Stipulation (~o. 15, p. 16 <br />OSM Findings Document: Stipulation A'o. 18, p. 7 <br />OSM TEA: Stipulation No. 17 (listed as No. 8 under Section 817.52(a)), p. 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.