My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33119
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:16 PM
Creation date
11/23/2007 7:31:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
10/22/1981
Doc Name
List - complete list of original stipulations
From
MLR
To
FILE NO C-007-80
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSM TEA: This stipulation has not been included in the TEA. <br />20. Stipulation: ALL SPRINGS IN THE 5-YE R PERMIT AREA AND ADJACENT AREA SHALL <br />BE MONITORED FOR DISCHARGE AND A JTAL T ON A QUARTERLY BASIS AS WEATHER <br />PERMITS. ALSO, (RLF~SPRI{JCyJS, ON NE NE ~ HE DRY FORK OF MINNESOTA <br />CREEK BASIN SHALL BE MONIITORED M THLY FOF'~A OCHARGE, PH, TEMPERATURE <br />AND CONDUCTIVITY WHEN WEATHER CONDITIONS PERPIIT. ~~~JJJJJJ <br />MLRD Findings Document: Stipulation No. 17, p. 17 <br />OSh1 Findings Document: Stipulation No. 21, p. 8 <br />OSM TEA: Stipulation No. 14 (listed as No. 5 under Section 817.52(a)), p. 34, <br />and stipulation No. 21, p. 66 as follows: <br />21. Stipulation: The applicant will monitor alt springs on the permit <br />area and provide data to the regulatory agency quarterly. The springs <br />should be sampled for flow and water quality. <br />21. Stipulation: RLL MONITOR ELLS ALL ~E` MONITORED FOR WATER LEVELS MONTHLY <br />AND WATER QUALITY ON A QT~jRLY F1A~~U'OR TNE, URATION OF THE 1-YEAR BASE- <br />LINE DATA COLLECTION PERT L A S~! S7IBMITTED T THE REGULATORY <br />AUTHORITY QUARTERLY. ~ h g01~L <br />MLRD Findings Document: Stipulation No. 18, p. I7 <br />OSM Findings Document: Stipulation No. 17, p. 7 <br />OSM TEA: Stipulation No. 13 (listed as No. 4 under Section 817.52(a)), p. 39 <br />22. Stipulation: THE APPLICANT'S QUARTERLY MONITORING REPORTS SHALL INCLUDE <br />QUALITY AND QUANT~~IY~~MI G RF/~ DISCNARGES FROM THE MINESITE. <br />WATER QUALITY M/ONI~~VCI N L .~O`PS ~ OF THE EFFLUENT LIMITATIONS PLUS <br />TOTAL DISSOLVED S LIDS. <br />MLRD Findings Document: Stipulation No. 22, p. 18 <br />OSM Findings Document: Stipulation No. 20, p. 7 <br />OSM TEA: This stipulation has not been included in the TEA <br />23. Stipulation: ALL WATER QUALITY ANALYSES SHALL INCLUDE THOSE P AMETERS IN <br />TABLE 4.9.1 PLUS A DETERh17NATION FOR ARSENIC. ~\n~ %' ~\~~ <br />• '~~~ MLRD Findings Document: Stipulation No. 19, p. 17 `U~- <br />• ~ .~ <br />~'' OSM Findings Document: Stipulation No. 22, p. 8 <br />OSM TEA: Stipulation No. 10 (listed as No. 1 under Section 817.52(a)), p. 33 <br />24. S'ti pulation: THE hONITORING PLAN PROPOSED BY ARCO COAL COMPANY TO GUNNISON <br />COUNTI' PLANNING COh1h1ISSZON'Sh'OULD BE INCUDED WZTNIN' THE APPLICATION SECTIO~J <br />_ 4. 9, SURFACE AND GROU~YD !r'ATER hONITORING .~ ALL DATA AND REPORTS SUDMITTE'D <br />TD-377E'ST7ITL'"~1CGrZNEERS OFFICE AND DITCH COMPANIES SHALL BE COPIED TO h1LRD AS <br />INCLUSION LdITHIN THE QUARTERLY REPORT REQUIRED UNDER SECTION 4.05.13(2) OF <br />~A THE RULES AND REGULATIONS. <br />a <br />1~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.