My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32991
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:13 PM
Creation date
11/23/2007 7:29:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977436
IBM Index Class Name
General Documents
Doc Date
1/23/2001
Doc Name
REQUEST FOR NOTIFICATION
From
CITY OF THORNTON
To
DNR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C~ <br />• <br />(5) Specifications that define (a) each type of material to be <br />used in the slope, (b) requirements for preparation of the <br />foundation prior to and during fill placement, and (c) <br />placement requirements, such as moisture content and <br />degree of compaction. <br />ii. A quality assurance plan for the installation of the slopes shall be <br />prepared by a Colorado registered engineer and shall be submitted <br />to Thornton for review and comment at least thirty (30) days before <br />the start of installation. The quality assurance plan shall include the <br />following: <br />(1) Procedures that will be used to provide horizontal and <br />vertical control and assure that the appropriate material is <br />placed as required by the design; <br />(2) Descriptions of the field and laboratory tests that will be <br />performed and the frequency of each type of test; <br />(3) Actions to be taken if unsatisfactory material or workmanship <br />are discovered in the installation; <br />(4) Qualifications of field and office personnel that will perform <br />the quality control. <br />iii. Thomton shall have the right to observe any portion of the slope <br />installation. <br />iv. Any interim written quality control observation reports and results of <br />field and laboratory tests received by Aggregate shall be provided to <br />Thornton upon or before the execution of this Agreement and shall <br />continue to be provided during the installation of the slopes. <br />Thomton may also have a representative present at any meetings <br />between Aggregate and its consultants or contractors relating to the <br />installation of the slopes, and Aggregate shall notifyThomton of any <br />such meetings at least twenty-four (24) hours prior to the time of <br />the meeting. <br />v. A final completion report prepared by a Colorado registered engineer <br />that demonstrates the fill was placed in accordance with the plans <br />and specifications shall be provided to Thornton within sixty (60) <br />Hammer <br />Option & Purchase Agreement <br />December 11, 2000 <br />Page 10 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.