My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32987
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:13 PM
Creation date
11/23/2007 7:28:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
3/2/1984
Doc Name
Revised Proposed Decision & Findings of Compliance
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br />Stipulation N0. 27 <br />THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO VISUALLY MONITOR THE <br />IRRIGATION DITCHES AND THE LAND SURFACE OVERLYING THE EAGLE N0. 9 MINE <br />IN THE YAMPA RIVER BIG BOTTOM ALLUVIAL VALLEY FLOOR. THE COMPANY SHALL <br />CONDUCT THIS MONITORING ON A WEEKLY BASIS DURING THE PERIOD BETWEEN <br />SNOWMELT AND THE ENO OF THE GROWING SEASON OF EACH YEAR. THE MONITORING <br />RECORDS SHALL BE KEPT ON FILE AT THE MINE OFFICE. IF SUBSIDENCE DAMAGE <br />IS OBSERVED, THE COMPANY SHALL IMMEDIATELY NOTIFY THE DIVISION AND SHALL <br />INSTITUTE THEIR MITIGATIVE PLAN PROPOSED IN SECTION 4.6.4, PAGE IV-194a <br />OF THE PERMIT APPLICATION. <br />As a result of mining in the 2W area of the Eagle No. 5 Mine, Stipulation No. <br />3 has been revised as follows: <br />Stipulation No. 3 <br />FOR THE EAGLE N0. 5 AND N0. 9 MINE EMPIRE ENERGY CORPORATION SHALL <br />CONDUCT MINE INFLOW STUDIES FOR ALL ACTIVE OR UNSEALED UNDERGROUND COAL <br />MINE WORKINGS. ANNUAL INFLOW STUDIES SHALL BE CONDUCTED FOR EACH ACTIVE <br />OR UNSEALED MINE IN THE MONTH Of JUNE, AND THE RESULTS OF EACH INFLOW <br />STUDY SHALL BE SUBMITTED TO THE DIVISION BY THE FIRST OF AUGUST OF THE <br />SAME YEAR. THE MINE INFLOW STUDIES SHALL INCLUDE: <br />A) THE MAPPING OF EACH POINT SOURCE INFLOW (I.E. FAULTS, FRACTURED <br />ROOF, FRACTURED FLOOR, EXPLORATION DRILL HOLE, ETC.) AND EACH AREA-WIDE <br />INFLOW (I.E., DRAINAGE FROM SEALS TO ABANDONED MINE WORKINGS: AREAS OF <br />WEEPING COAL FACES, ROOF, OR FLOOR, ETC.) ON UP-TO-DATE MINE WORKINGS <br />MAPS; . <br />B) THE MONITORING OF ALL MAPPED INFLOWS FOR FLOW RATES, pH, <br />ELECTRO-CONDUCTIVITY AND TEMPERATURE; AND <br />C) THE PRODUCTION OF TABLES OF ALL INFLOW MAPPED WITH DATA ON THEIR <br />FLOW RATES, pH'S, ELECTRO-CONDUCTIVITIES AND TEMPERATURES; AND THEIR <br />SOURCE {I.E., FAULTS, FRACTURES, DRAINAGE FROM SEALS, ETC.). <br />
The URL can be used to link to this page
Your browser does not support the video tag.