My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32987
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:13 PM
Creation date
11/23/2007 7:28:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
3/2/1984
Doc Name
Revised Proposed Decision & Findings of Compliance
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br />PROPOSED DECISION ~ ~ ~~u <br />The Colorado Mined Land Reclamation Division proposes to approve, with <br />stipulations, an application for a permit revision to conduct coal mining by <br />Empire Energy Corporation for the Eagle No. 9 Mine and an application for a <br />revision to extend the permit boundary in the Eagle No. 5 Mine. <br />The approval decision is based on a finding that the proposed operations will <br />comply with all requirements of the Colorado Surface Coal Mining Reclamation <br />Act, C.R.S. 34-33-101 et se ., and the regulations promulgated thereunder. <br />Three additional stipulations have been attached to this proposed approval <br />decision and one stipulation (No. 3) has been revised. The revision <br />applications and the stipulations will become a binding part of the permit, <br />upon approval. These stipulations are in addition to the 23 stipulations <br />included in the September 2, 1983 findings document and have been numbered <br />starting with 24. They are as follows. <br />Stipulation No. 25 <br />EMPIRE ENERGY CORPORATION SHALL PERFORM A MINIMUM OF TWO ADDITIONAL <br />COMPLETE CHEMICAL AND PHYSICAL ANALYSES ON ROOF, FLOOR INTERBURDEN (ROCK <br />SPLIT) ANO COAL STRATA FROM REPRESENTATIVE LOCATIONS IN THE EAGLE N0. 9 <br />MINE'S PERMIT AREA. RESULTS OF THESE ANALYSES SHALL BE SUBMITTED 70 THE <br />DIVISION WITHIN 60 DAYS OF THE ISSUANCE OF THIS PERMIT. <br />Stipulation No. 26 <br />THE DIVISION DIRECTS EMPIRE ENERGY CORPORATION TO INSTALL ANO MONITOR <br />ONE ADDITIONAL SET OF SURVEY MONUMENTS OVER A SET OF DEVELOPMENT MAINS <br />AT THE EAGLE N0. 9 MINE. THE MONUMENT SERIES OVER THE DEVELOPMENT MAINS <br />AND MONUMENT SERIES HAND I SHALL 8E INSTALLED WITHIN SIX (6) MONTHS OF <br />THE PERMIT ISSUANCE. THE SURVEY MONUMENTS SHALL BE PLACED OVER MINE <br />AREAS WHICH WILL BE MINED WITHIN TWELVE (12) MONTHS OF THE TIME THAT <br />MINING BEGINS. TWO MONTHLY MEASUREMENTS OF THE SURVEY MONUMENT <br />ELEVATIONS SHALL BE MADE PRIOR TO UNDERMINING THE SETS OF SURVEY <br />MONUMENTS. ONE MEASUREMENT OF THE SURVEY MONUMENT ELEVATIONS SHALL BE <br />MADE IMMEDIATELY AFTER DRIVING THE DEVELOPMENT MAINS AND AFTER ROOM ANO <br />PILLAR ADVANCE. ALL SUBSEQUENT MONITORING OF SURVEY MONUMENT ELEVATIONS <br />SHALL BE MADE QUARTERLY. ALL DATA FROM THIS SUBSIDENCE MONITORING SHALL <br />BE SUBMITTED IN THE COMPANY'S QUARTERLY SUBSIDENCE REPORT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.