My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32611
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32611
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:04 PM
Creation date
11/23/2007 7:21:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
General Documents
Doc Date
5/1/1993
Doc Name
Proposed Decision & Findings of Compliance for RN2
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~i <br />2. The Division approves a permanent diversion. This diversion <br />is consistent with applicable state law, will not diminish <br />downstream water rights and meets the requirements of <br />Rule 4.05.4 (4.05.4(4)). <br />3. The permanent diversion shall make use of artificial structurai <br />controls in order to allow it to remain in dynamic equilibrium <br />with the drainage basin system. The Division approves the use <br />of Such structures (4.05.4(4)(b)>. <br />D. Sedimentation Ponds <br />1. No specific approvals have been granted. <br />E. Acid-forming and Toxic-forming Spoil <br />1. No specific approvals have been granted. <br />F. Impoundments <br />1. No specific approvals have been granted. <br />G. Surface and Ground Water Monitoring <br />1. The applicant will conduct monitoring of ground water in a <br />manner approved by the Division. The ground water monitoring <br />plan is contained in the permit application, volume 2, on <br />pages 551 through 554. <br />2. The applicant will conduct monitoring of surface water in a <br />manner approved by the Division. The monitoring plan was <br />submitted under 2.05.6(3>(b)(iv) and is contained in the permit <br />application, volume 2, on pages 551 through 554. <br />H. The following stipulation is required in order to complete this <br />section: <br />Stipulation No. 8 <br />WITHIN 30 DAYS OF PERMIT REVISION APPROVAL, THE PERMITTEE WILL <br />SUBMIT TO THE DIVISION WRITTEN DOCUMENTATION VERIFYING THAT THE TWO <br />WATER WELLS ACROSS INTERSTATE 25 FROM THE MINE ENTRANCE, REFERENCED <br />ON PAGE 547 OF THE PERMIT APPLICATION, ARE CURRENTLY OWNED BY <br />SUNDANCE COAL COMPANY. <br />1. No specific approvals have been granted. <br />I. Discharge of Water into an Underground Mine <br />1. No specific approvals have been granted. <br />J. Stream Buffer Zones <br />1. No specific approvals have been granted. <br />_lZ_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.