My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32534
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32534
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:02 PM
Creation date
11/23/2007 7:20:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
General Documents
Doc Name
Drawing 1 Bond Revocation C-1981-015 Slope Drainage Course Sheet 1 of 1
Permit Index Doc Type
Reclamation Project
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
north east of the sediment pond as delineated in the field, or placed against the excavated bench cuts. It is assumed that <br />the terrace location will be used for excavated material from the lower portion of the drainage course construction. Prior <br />to depositing excavated material at either the terracelocation or against the excavated bench cuts, existing vegetation <br />and soils to a 24" depth-will be graded. off and stockpiled. Final grade at the terrace location once hauling has been <br />completed will not exceed a 3:1 slope in any direction. Stockpiled vegetation and soils will be evenly redistributed over <br />the deposited material from drainage. course construction upon completion of earthmoving procedures. <br />If any trash is encountered during excavation for channel construction, trash will be hauled off to the nearest County <br />approved landfill-site. <br />Measurement and Payment <br />No unitmeasurement for payment will be madefor Item 2. A lump-sum bid for drainage construction will be reflected <br />under Item 2 of the Bid Schedule. The price bid will include all of the CONTRACTOR'S cost of whatever nature to <br />provide a drainage channelinaccordance withthe-drawing and specifications, including all labor, equipment, excavation, <br />hauling, regrading, operating supplies, salaries of operators andany other expenses incidental to the operation of the <br />equipment irr the performance of the channet construction in accordance with this specification and bid item. <br />TEM 3 - DRAINAGE CONSTRUCTION -ROCK OUTCROP TO SLOPE CHANNEL <br />An eight (8) foot wide, 4' deep drainage course will be constructed to provide positive drainage from the location where <br />the slope channel day-tights on the bench to the rock ontarop ledge- as located in the field. The drainage will be <br />constructed according to the attached Drawing 1, Drainage Course Cross Section WITHOUT the riprap requirements. <br />Check dams will be contracted at 50' imervals from with riprap per attached Drawing 1. Check dam riprap, available <br />on-site, will consist of an everily distributed combination of 60% minimum 4' diameter rockriprap, 20% 2' to 4' diameter <br />rock and 20% 12" to 18" rock. The 4' diameter rock will be keyed imo the bottom of the constructed- 3: t channel <br />through excavation placement to a depth between 18" and 24". The check dam will be 6' in slope length constructed <br />the eat'se width ofthechannel. Side slopes to the constnrcted charmek will be at a maximum 3:1 scope. Pasitive drainage <br />will be maintained from the bench cut to the east, into the drainage channel. <br />A~faterial as a resuh of drainage- course construction maybe excavated and hauled to or graded- against the excavated <br />bench cuts. Prior to depositing or grading excavated material against the excavated bench cuts, existing vegetation and <br />soils to a 24" depth will begraded off and stockpiled Stockpiled vegetation and soils will be evenly redistributed over <br />the deposited material from drainage course construction upon completion of earthmoving procedures. <br />If arry trash is encoumered daring excavation for charmel construction, trash will be hauled off to the nearest County <br />approved landfill site. <br />Measnrement and' Payment <br />Na amt meas2uement for paymerrt will be-made for Item 3. A lump sarrr bid for drainage construction will be reflected <br />under Item 3 of the Bid Schedule. The price bid will include all of the CONTRACTOR'S cost of whatever nature to <br />provide a drainage channel in accordance with the drawing and specifications, including all }abor, equipment, excavation, <br />hauling, regrading, operating supplies, salaries of operators andany other expenses incidental to the operation of the <br />equipment in the performance of the charmet cronstructiorr irr accordance with this spenifrcatiorr and- bfd item. <br />
The URL can be used to link to this page
Your browser does not support the video tag.