north east of the sediment pond as delineated in the field, or placed against the excavated bench cuts. It is assumed that <br />the terrace location will be used for excavated material from the lower portion of the drainage course construction. Prior <br />to depositing excavated material at either the terracelocation or against the excavated bench cuts, existing vegetation <br />and soils to a 24" depth-will be graded. off and stockpiled. Final grade at the terrace location once hauling has been <br />completed will not exceed a 3:1 slope in any direction. Stockpiled vegetation and soils will be evenly redistributed over <br />the deposited material from drainage. course construction upon completion of earthmoving procedures. <br />If any trash is encountered during excavation for channel construction, trash will be hauled off to the nearest County <br />approved landfill-site. <br />Measurement and Payment <br />No unitmeasurement for payment will be madefor Item 2. A lump-sum bid for drainage construction will be reflected <br />under Item 2 of the Bid Schedule. The price bid will include all of the CONTRACTOR'S cost of whatever nature to <br />provide a drainage channelinaccordance withthe-drawing and specifications, including all labor, equipment, excavation, <br />hauling, regrading, operating supplies, salaries of operators andany other expenses incidental to the operation of the <br />equipment irr the performance of the channet construction in accordance with this specification and bid item. <br />TEM 3 - DRAINAGE CONSTRUCTION -ROCK OUTCROP TO SLOPE CHANNEL <br />An eight (8) foot wide, 4' deep drainage course will be constructed to provide positive drainage from the location where <br />the slope channel day-tights on the bench to the rock ontarop ledge- as located in the field. The drainage will be <br />constructed according to the attached Drawing 1, Drainage Course Cross Section WITHOUT the riprap requirements. <br />Check dams will be contracted at 50' imervals from with riprap per attached Drawing 1. Check dam riprap, available <br />on-site, will consist of an everily distributed combination of 60% minimum 4' diameter rockriprap, 20% 2' to 4' diameter <br />rock and 20% 12" to 18" rock. The 4' diameter rock will be keyed imo the bottom of the constructed- 3: t channel <br />through excavation placement to a depth between 18" and 24". The check dam will be 6' in slope length constructed <br />the eat'se width ofthechannel. Side slopes to the constnrcted charmek will be at a maximum 3:1 scope. Pasitive drainage <br />will be maintained from the bench cut to the east, into the drainage channel. <br />A~faterial as a resuh of drainage- course construction maybe excavated and hauled to or graded- against the excavated <br />bench cuts. Prior to depositing or grading excavated material against the excavated bench cuts, existing vegetation and <br />soils to a 24" depth will begraded off and stockpiled Stockpiled vegetation and soils will be evenly redistributed over <br />the deposited material from drainage course construction upon completion of earthmoving procedures. <br />If arry trash is encoumered daring excavation for charmel construction, trash will be hauled off to the nearest County <br />approved landfill site. <br />Measnrement and' Payment <br />Na amt meas2uement for paymerrt will be-made for Item 3. A lump sarrr bid for drainage construction will be reflected <br />under Item 3 of the Bid Schedule. The price bid will include all of the CONTRACTOR'S cost of whatever nature to <br />provide a drainage channel in accordance with the drawing and specifications, including all }abor, equipment, excavation, <br />hauling, regrading, operating supplies, salaries of operators andany other expenses incidental to the operation of the <br />equipment in the performance of the charmet cronstructiorr irr accordance with this spenifrcatiorr and- bfd item. <br />