Laserfiche WebLink
KANEB PIPE LINE <br />OPER ATfNG <br />PARTNERSHIP, L. P. <br />January 15, 2004 <br />Mr. Dan Kehn <br />Don Kehn Construction, Inc. <br />6550 S. County Road 5 <br />Fort Collins, CO 80528 <br />RE: Site Work <br />Timnath Pit <br />Fort Collins, Colorado <br />Dear Mr. Kehn: <br />I have reviewed your letter and drawing regarding the above referenced project. Kaneb <br />will have no objections to this proposed mining operation provided the following <br />conditions as stated in your letter are followed: <br />• One pipeline crossing will be utilized on a temporary construction basis. Kaneb <br />will verify at least 5.5 feet of earth cover at this crossing. <br />• Said crossing will be removed upon completion. <br />• Mining setback of 50 feet from the pipeline centerline will be maintained. <br />Please contact Mr. Tom Swallow, a Kaneb representative, at (303) 877-5071 to locate the <br />pipeline and to verify the depth of cover. Please contact him forty-eight hours prior to <br />any activities near or over the pipeline so that he may schedule a time to meet you on site. <br />If you have any questions, please contact Mr. Dale Smith or myself at (316) 773-9000. <br />Sincerely, <br />,~ f~CLurd <br />Dianne Davis <br />Engineering Assistant <br />DED/dd <br />CC: Mr. Tom Swallow <br />Kaneb Dupont Terminal <br />7340 West 21st Si. N., Suice 200 <br />Wichita, Kansas 67205 <br />phone 316.773.9000 <br />fax 316.773.9001 <br />www.kanebpipeline. com <br />