Laserfiche WebLink
<br />~~ <br />® H SI Don Kehn <br />~~FORT COLlINS Construction Inc. <br />GENERAL CON7RAC70RS <br />Asphalt Paving Crushed Aggregates • Earihmoving • Trucking • Underground Utilities • Rotomilling <br />December 29, 2003 <br />Dale E. Smith <br />KANEB Pipeline Co. <br />7340 W. 21s` St. N., Suite 200 <br />Wichita, KS 67205 <br />KE: Site Work <br />Dear Sir: <br />This letter serves to inform you of our proposed mining operations at the Timnath Pit <br />southeast of Fort Collins, CO. KANEB pipeline reference; Casper -Denver 8"; Series <br />4302, Line List 346 and 347 per letter dated August 2, 1994, from Wyco Pipeline Co. <br />We are proposing mining a small area west of the referenced pipeline with the intent of <br />creating permanent wetlands in conjunction with our mining plan- Said area will be <br />backfilled to approximately the elevation and topogaphy pre-mining. There will be no <br />drainage culverts installed nor any changes to existing waterways. <br />One pipeline crossing will be utilized on a temporary constmetion basis and at least 5.5 <br />feet of earth cover will be verified by KANEB. Said crossing will be removed upon <br />completion. Mining setback of 50' from the pipeline centerline will be maintained. <br />Please contact me with your comments. <br />Sincerely, <br />~~~ <br />Dan Kehn <br />!ph <br />Attachments: Sketch <br />6550 So. County Road 5 • Fort Collins, Colorado 80528 • Phone (970) 226-4111 • FAX (970) 226-4115 <br />1012 So. Greeley Hwy. • Cheyenne, Wyoming 82007 • Phone (307) 632-4000 • FAX (307) 632-4016 <br />