Laserfiche WebLink
Table 1: Proposed Actions on RDA <br />Structure Action Start End <br /> Date Date <br />Reclaimed slope Dress slope where rills September 2, 1998 September 16, 1998 <br /> have developed, seed, <br /> mulch, and install either <br /> straw bale dikes, silt <br /> fences, or brush dams if <br /> necessary. <br />Terrace benches Remove waste and coal September 2, 1998 September 16, 1998 <br /> fines, grade to RDA <br /> diversions, re-seed. <br />RDA Slope above Third Grade to final slope, October 20, 1998 December 17, 1998 <br />Terrace Bench cover with subsoil and <br /> topsoil, and seed. <br />Pond 008 Pump dry to other facility Ongoing. Two weeks after a <br /> ponds. Develop inlet rain event. <br /> sumps if necessary. <br /> Clean pond. Remove Two weeks after a Following six weeks <br /> inlet deltas and truck to rain event. of dry conditions in <br /> both the Coal the pond. <br /> Development Waste Pile <br /> and the crest of the RDA. <br /> Certify pond size. Three weeks NA <br /> following the <br /> completion of pond <br /> dredging. <br />2 <br />