Laserfiche WebLink
and placement costs. Planned topsoil redistribution depths were not specified in the <br />bid documents and aze unknown. Original permitting indicated a plan for replacement <br />of about five inches oftopsoil over the entire disturbed azea. A cover standard of 23% <br />live vegetation applies to the site. <br />PHASE III <br />Rule 3.03.1(2)(c) states that the final portion of performance bond, "shall be <br />released when the permitee has successfully completed all surface coal <br />mining reclamation operations in accordance with this approved reclamation <br />plan, and the final inspection procedures of 3.03.2 have been satisfied. This <br />shall not be before the expiration of the period specified for revegetation <br />responsibility in 3.02.3." Rule 3.03.1(4) states, " No bond shall be fully <br />released until all reclamation requirements of these Rules and the Act are <br />fully met..." The same rule goes on to state, " No acreage shall be released <br />from the permit area until all surface coal mining and reclamation operations <br />on that acreage have been completed in accordance with the approved <br />reclamation plan." Revegetation standards for the New Pryor Mine include a <br />23% cover standard, 2371bs/acre of live vegetative production and a species <br />diversity standard of at least three perennial grass species, each contributing <br />at least 3%, but not greater than 60% relative cover. At least one of these <br />species will be a warm season grass and at least one shall be a cool season <br />grass. The post mining land use for the site is rangeland. A Phase III bond <br />release can occur: <br />• When the minimum period of liability of 10 yeazs is met. [Section 3.02.3(2)(b)]; <br />• When the permitee has successfully completed all surface coal mining <br />reclamation operations in accordance with the approved reclamation plan <br />[Section 3.03.1(2)(c)]; <br />• When all reclamation requirements of the Rules and the Act are fully met <br />[Section 3.03.1(4)]; and <br />• When the final inspection and evaluation procedures of Section 3.03.2 have been <br />satisfied [Section 3.03.1(2)(c)]. <br />IV. OBSERVATIONS AND FINDINGS <br />Previous Bond Releases <br />Since the time that the permit was revoked and the bond was forfeited, no bond <br />release applications were submitted, reviewed, or approved. This TOJ is a combined <br />Phase I, II and III release of liability for the entire site. <br />Public Notice and Public Comment <br />The Division published notice of the bond release and termination of jurisdiction in <br />6 <br />