Laserfiche WebLink
<br />Stipulation No. 5 <br />CWI shall continue to maintain rain gage and evaporation pan monitoring at <br />or near the CWI wellfield. The rain gage shall record daily and the <br />evaporation monitor shall record evaporation monthly when not frozen. <br />Resolved: This stipulation is currently found as Stipulation No. 30 in <br />the 1988 document. <br />Stipulation No. 6 <br />CWI shall submit a plan to monitor any water quantity changes as a result <br />of changing the overland ditch point of diversion to West Roatcap Creek. <br />The plan shall be submitted within 120 days of permit issuance. <br />Resolved: A plan was submitted January 14, 1986, but it was not <br />implemented due to confusion following the mine fire in June 1988. This <br />stipulation is currently found as Stipulation No. 31 in the 1988 document. <br />_17_ <br />