Laserfiche WebLink
<br />Stipulation No. 9 <br />WITHIN THIRTY <br />SUBMIT A PLAN <br />BERM INTO THE <br />THE DIVISION <br />Stipulation No. 10 <br />(30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST <br />TO PREVENT SEEPAGE FROM COAL GULCH THROUGH THE <br />FACILITIES AREA. THIS PLAN MUST BE APPROVED BY <br />AND IMPLEMENTED PRIOR TO COMMENCEMENT OF MINING. <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST <br />SUBMIT TO THE DIVISION FOR APPROVAL, A PLAN FOR RECLAMATION OF <br />THE COAL GULCH DIVERSION AND PLANS FOR RE-ESTABLISHMENT OF THE <br />PERIMNENT POST-MINING COAL GULCH CHANNEL. THE DESIGNS MUST BE <br />APPROVED IN WRITING BY THE DIVISION PRIOR TO THIS STIPULATION <br />BEING SATISFIED. <br />Stipulation No. 11 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST <br />SUBMIT TO THE DIVISION A PLAN FOR EROSION CONTROL OF THE <br />TEMPORARY COAL GULCH DIVERSION ADEQUATE TO HANDLE THE <br />VELOCITIES OF THE 10-YEAR, 24-HOUR STORM. THIS PLAN MUST BE <br />APPROVED PRIOR TO IMPLEMENTATION. <br />Stipulation No. 12 <br />7HE APPLICANT MUST SUBMI7 ADEQUATE DESIGNS FOR THE CULVERT <br />CONVEYING FLOWS FROM THE COAL GULCH DIVERSION UNDER THE HAUL <br />ROAD WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE. THESE <br />DESIGNS MUST BE APPROVED BY THE DIVISION PRIOR TO ANY HAUL <br />ROAD CONSTRUCTION. <br />Stipulation No. 13 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE AND PRIOR TO ANY <br />ADDITIONAL DISTURBANCE, THE APPLICANT MUST SUBMIT TO THE <br />DIVISION FOR APPROVAL DESIGNS FOR THE WEST DITCH ADEQUATE TO <br />PASS THE FLOWS FROM A 10-YEAR, 24-HOUR STORM. THE DESIGNS <br />MUST BE APPROVED IN WRITING BY THE DIVISION PRIOR TO THIS <br />STIPULATION BEING SATISFIED. <br />