Laserfiche WebLink
T <br />Stipulation No. 5 <br />1. THE PERMITTEE SHALL CONSTRUCT A DITCH TO INTERCEPT DRAINAGE <br />ABOVE THE PLANT GROWTH MEDIUM STOCKPILES ADJACENT TO THE <br />HIGHWALL/SLOPE AREAS. ALONG THE PERIMETER OF THE STOCKPILES A <br />CONTAINMENT DITCH SHALL BE CONSTRUCTED. <br />2. THE PLANT GROWTH MEDIUM STOCKPILES SHALL BE SEEDED WITH THE <br />APPROVED RECLAMATION SEED MIX, MINUS WOODY PLANT SEEDS, AND <br />MULCHED WITH STRAW OR NATIVE HAY AT 4,000 POUNDS/ACRE DURING <br />THE FIRST APPROVED SEEDING/PLANTING SEASON AFTER PERMIT <br />ISSUANCE. <br />Stipulation No. 6 <br />THE REVEGETATION SUCCESS CRITERION FOR THE COAL GULCH MINE <br />SHALL BE 70% LIVE YEGETATIVE GROUND COVER IN ACCORDANCE WITH <br />RULE 4.15.10. <br />Stipulation No. 7 <br />WITHIN SIXTY (60) DAYS OF PERMIT ISSUANCE, THE PERMITTEE WILL <br />SUBMIT DETAILED DESIGNS FOR BACK FILLING AND GRADING. THESE <br />SHALL ADDRESS REPLACEMENT OF THE EXISTING OVERBURDEN AT THE <br />SOUTHEAST CORNER OF THE PERMIT AREA ALONG THE HIGHWALL WITHIN <br />THE FACILITIES AREA. ALL SLOPES WITHIN THE DISTURBED AREA <br />SHALL BE NO STEEPER THAN 3V:1H. THE PLAN SHALL ADDRESS HOW <br />THE POST-MINING CONFIGURATION MEETS THE REQUIREMENTS OF <br />APPROXIMATE ORIGINAL CONTOUR, AND BLENDS WITH THE SURROUNDING <br />TOPOGRAPHY. THE PERMITTEE WILL SUPPLY CROSS-SECTIONS OF THE <br />PROPOSED POST-MINING TOPOGRAPHY ON 200 FOOT CENTERS THROUGH <br />THE DISTURBED AREA. THE PERMITTEE SHALL ALSO PROVIDE A <br />REVISED POST-MINING TOPOGRAPHY MAP WITH MAXIMUM FIVE-FOOT <br />CONTOUR INTERVALS. THE REQUIREMENTS OF THIS STIPULATION WILL <br />BE SATISFIED ONLY UPON WRITTEN APPROVAL BY THE DIVISION TO <br />THAT EFFECT. <br />Stipulation No. 8 <br />WITHIN SIXTY (60) DAYS OF PERMIT ISSUANCE, THE PERMITTEE WILL <br />PROVIDE A PLAN FOR DIVISION APPROVAL DISCUSSING PLACEMENT OF <br />COAL FINES DURING RECLAMATION, AND DISPOSAL OF TRASH AND <br />NON-COAL WASTE. <br />