Laserfiche WebLink
<br />Stipulation No. 14 <br />THE APPLICANT MUST INSTALL A STAFF GAGE CLEARLY MARKED WITH <br />THE 60% CLEANOUT ELEVATION IN THE SEDIMENT POND. <br />Stipulation No. 15 <br />BEFORE THE PERMANENT POND DESIGN CAN BE CONSIDERED ADEQUATE, <br />THE APPLICANT MUST JUSTIFY THE USE OF A CURVE NUMBER OF 72. <br />THIS MUST BE DONE WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 16 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST <br />PROVIDE THE DIVISION WITH DETAILED POND OUTFLOW CALCULATIONS <br />DEMONSTRATING THAT THE 12-INCH DIAMETER PRINCIPAL SPILLWAY <br />WILL NOT DE WATER THE MAJORITY OF WATER IN THE SEDIMENT POND <br />BEFORE 24-HOURS FOLLOWING A DESIGN STORM. IF THESE <br />CALCULATIONS SHOW AN INADEQUATE HOLDING TIME, THE PRINCIPAL <br />SPILLWAY/DE WATERING DEVICE MUST BE REDESIGNED, AND <br />RECONSTRUCTED WITHIN 60 DAYS OF PERMIT ISSUANCE. <br />Stipulation No. 17 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT WILL <br />SEAL THE POND WITH A NON-TOXIC BENTONITE SEAL TO PREVENT <br />FUTURE INFILTRATION. <br />Stipulation No. 18 <br />WITHIN THIRTY (30) DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST <br />SUBMIT TO THE DIVISION FOR APPROVAL A DETAILED PLAN FOR <br />MONITORING THE SEDIMENT POND pH AND TREATING THIS WATER IF <br />NECESSARY. THE TREATMENT PLAN SHOULD INCLUDE THE TYPE AND <br />AMOUNT OF REGEANT TO BE UTILIZED, METHOD OF APPLICATION, AND <br />WHEN AND HOW THE PLAN WILL BE IMPLEMENTED. <br />Stipulation No. 19 <br />PRIOR TO THE DIVISION APPROVING THE SMALL AREA EXEMPTION, THE <br />APPLICANT MUST COMMIT TO NO COAL STORAGE IN THIS AREA OR <br />DEMONSTRATE THAT IN GRANTING THIS SMALL AREA EXEMPTION THERE <br />WILL BE NO INCREASE IN SUSPENDED SOLIDS OUTSIDE THE PERMIT <br />AREA. <br />