My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31162
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31162
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:31 PM
Creation date
11/23/2007 6:56:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
General Documents
Doc Date
3/26/1985
Doc Name
PN 77-213 IS NOW APART OF PN M1973-007SG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
into the Sand Pit area in order to merge the two operatic` the <br />same elevation as the existing settl he Daniel's S t <br />• area. This process will occur rather slowly and will therefore allow <br />~----~~ <br />sufficient time far the establishment of stability in the back:filled <br />waste material. <br />The ridge just to the south of the processing plant will be removed <br />along with a slope reduction and removal along Academy Boulevard to the <br />north of the processing site. This will help with possible future <br />access as well as improve the sometimes difficult maintenance process <br />along Academy Boulevard. <br />EAST OF ACADEMY BOULEVARD: <br />---- -- ------- ---------- <br />The slopes along Academy from the area of the present ditch <br />crossing southward will be reduced or eliminated. This will improve <br />future access and visibility of the site making it mare attractive far <br />• construction. Slopes into the pit will be rather gradual being, at most <br />2.5:1 and mast generally in the range of 3:1 to 5:1. Also, 6y reducing <br />the highway slopes it helps to create a more favorable slope length thus <br />helping to increase the revegtation potential. <br />The linkage between Phase Ie and IIe will occur by mining the sand <br />under the existing ditch and either piping the ditch across the gap as <br />occurs currently on Academy Boulevard ar the ditch will be moved to <br />another location. The latter is preferred. The sand under the ditch is <br />in Phase Ve which is the last phase to he mined, This will providg <br />sufficient tiee far decisions to be made as to what to do with the <br />ditch. <br />In the northeastern corner of the Fhase IIe area is a large fill <br />similar tm what will 6e done to the Sand Pit area on the west side of <br />. Academy. This fill will he made of processing wastes. Its location and <br />F'AGE 4 OF 14 - EXHIBIT E <br />
The URL can be used to link to this page
Your browser does not support the video tag.