My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31086
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:28 PM
Creation date
11/23/2007 6:52:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
12/15/1983
Doc Name
STIPULATIONS 7 AND 23 PN CO-044-81
From
EMPIRE ENERGY CORP
To
MLRD
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The underground reservoir was constructed adjacent to pond 9-P2. <br />Prior to construction, approximately 22 yards of topsoil was removed <br />from the site and stockpiled for future reclamation work. The topsoil <br />salvaged is in the Turret series (mapping unit 60B) and approximately 18 <br />inches of good topsoil is available. The reader is referred to Appendix <br />III-9 fora discussion of the suitability of this soil as a plant growth <br />media. A pit was excavated and a large diameter culvert was placed in <br />the pit. A trench was excavated and a water line was laid from the <br />culvert into the pond. The trench was backfilled and will be seeded in <br />the fali with the rangeland/wildlife habitat seed mixture. <br />A pump house will be constructed over the culvert, red rock will be <br />• placed around the pump house to provide suitable access during the year, <br />the house will provide easier maintenance of the pump and year-round <br />access to the pump. The fresh water line will lead from the pump house <br />up to the storage tank. <br />Due to the smal 1 amount of topsoi 1 and subsoi 1 stockpi 1 ed at the <br />site, a variance is requested from the sediment control requirements <br />contained in Rule 4.05.5. Hay bales will be placed around the top of <br />the stockpile until adequate vegetative cover is established en the <br />stockpile. This will minimize the amount of sediment running off of the <br />piles unto adjacent land. <br />The water line will be laid through a reference area fora portion <br />of its length. The line will be laid on existing roads where it passes <br />• through the reference area. In other areas, the line will be laid along <br />the existing road whenever possible. Rubber-tired trucks will be used <br />to lay the line and disturbance should be minimal. <br />(P.EV. 12/13;83) IV-44g <br />
The URL can be used to link to this page
Your browser does not support the video tag.