Laserfiche WebLink
-8- <br />OSM TER: This stipulation has not been included in the TER. <br />20. Stipulation: ALL SPRINGS IN TXE 5-YEAR PERMIT AREA AND ADJACENT AREA SHALL <br />BE MONITORED FOR DISCHARGE AND WATER QUALITY ON A QUARTERLY BASIS AS WEATHER <br />PERMITS. ALSO, RLL SPRINGS ON THE NORTHERN HALF OF TXE DRY FORK OF MINNESOTA <br />CREEK BASIN SHALL BE MONITORED MONTHLY FOR RATE OF DISCHARGE, PH, TEMPERATURE <br />AND CONDUCTIVITY WHEN WEATHER CONDITIONS PERMIT. <br />MLRD Findings Document: Stipulation No. 17, p. 17 <br />OSM Findings Document: Stipulation No. 21, p. 8 <br />OSM TEA: Stipulation No. 14 (listed as No. 5 under Section 817.52(a)), p. 34, <br />and stipulation No. 21, p. 66 as follows: <br />21. Stipulation: The applicant will monitor all springs on the permit <br />area and provide data to the regulatory agency quarterly. The springs <br />should be sampled for flow and water quality. <br />21. Stipulation: ALL MONITOR WELLS SHALL BE MONITORED FOR WATER LEVELS MONTHLY <br />RND WATER QUALITY ON R QUARTERLY BASIS FOR THE DURATION OF THE 1-YEAR BASE- <br />LINE DATA COLLECTION PERIOD. ALL DATA SHALL BE SUBMITTED TO THE REGULATORY <br />AUTHORITY QUARTERLY. <br />MLRD Findings Document: Stipulation No. 18, p. 17 <br />OSM Findings Document: Stipulation No. 17, p. 7 <br />OSM TEA: Stipulation No. 13 (listed as No. 4 under Section 817.52(a)), p. 34 <br />22. Stipulation: THE APPLICANT'S QUARTERLY MONITORING REPORTS SHALL INCLUDE <br />QUALITY AND QUANTITY MONITORING OF ALL DISCHARGES FROM THE MINESITE. <br />WATER QUALITY MONITORING SHALL CONSIST OF THE EFFLUENT LIMITATIONS PLUS <br />TOTAL DISSOLVED SOLIDS. <br />MLRD Findings Document: Stipulation No. 22, p. 18 <br />OSM Findings Document: Stipulation No. 20, p. 7 <br />OSM TEA: This stipulation has not been included in the TEA <br />`.~ 23. Stipulation: ALL WATER QUALITY ANALYSES SHALL INCLUDE THOSE PARAMETERS IN <br />~V~ TABLE 4.9.1 PLUS R DETERMINATION FOR ARSENIC. <br />.., <br />MLRD Findings Document: Stipulation No. I9, p. 17 <br />`; <br />~:' ~~~ OSM Findings Lbcument: Stipulation No. 22, p. 8 <br />OSM TEA: Stipulation No. 10 (listed as No. 1 u dy~eer Section 817.52(a)), p. 33 <br />in~~~~e~l <br />24. Stipulation: THE MONITORING PLAN PRO Y ARCO COAL COMPANY TO GUNNISON <br />COUNTY PLANNING COMMISSION SHOULD BE INC DED ITHIN THE APPLICATION SECTION <br />4.9, SURFACE AND GROUjJD WR TER MONITO LL DATA AND REPORTS SUBMITTED <br />'~ - ~Td~'THE""STATE`EN~INEERS OFFICE AND DITCH COMPANIES SHALL BE COPIED TO MLRD RS <br />*~ ~ INCLUSION WITHIN THE QUARTERLY REPORT REQUIRED UNDER SECTION 4.05.13(2) OF <br />s} {., THE RULES AND REGULATIONS. <br />- '; <br />I;~. 3 ., <br />