-4- <br />29. Prior to placement of drainage culverts, the applicant shall submit to <br />the regulatory authorities a revised design For pipes 10 and 11 incorpor- <br />ating sufficient flow capacity to prevent ditch overtopping. The applicant <br />shall also submit a plan and design drawings for road culvert trash racks <br />to be installed on culverts of 30 inches diameter or less. <br />OSM TER: Stipulation No. 35 (listed as "c" under Section 817.180), p. 190 <br />7. Stipulation: UPON COMPLETION OF NEGOTIATIONS TO ACQUIRE TNAT RIGHT TO INSTALL <br />RND USE A RAILROAD SIDING AND LOADOUT FACILITY, ARCO COAL MUST SUBMIT TO THE <br />DIVISION A SEDIMENTATION CONTROL PLAN FOR THIS AREA BY SEPTEMBER 30, 1981. <br />MLRD Findings Document: Stipulation No. 37, p. 45 <br />OSM Findings Document: This stipulation has not been included in the OSM <br />findings document. <br />OSM TEA: Stipulation No. 36 (listed as "d" under Section 817.180), p. 190 <br />8. Stipulation: DESCRIBE IN DETAIL THE METHOD OF CAPPING (OR FILLING) BORE HOLES <br />FROM THE SURFACE IN ORDER TO PREVENT HAZARDS TO THE HYDROLOGIC BALANCE. THIS <br />INFORMATION MUST BE SUBMITTED TO THE DIVISION BY SEPTEMBER 30, 1981. <br />MLRD Findings Document: Stipulation No. 40, p. 45 <br />OSM Findings Document: Stipulation No. 7, p. 5 as follows: <br />7. RRCO must describe in detail the method of capping (or filling) bore holes <br />from the surface in order to prevent hazards to the hydrologic balance. <br />This information must be submitted to the regulatory authority. The appli- <br />cant must present plans showing how mine openings will be sealed to prevent <br />mine inflows upon completion of mining. These plans shall be submitted <br />to the regulatory prior to issuing the next 5-year permit. <br />OSM TEA: Stipulation No. 3, p. 9 as follows: <br />3. Stipulation: ARCO COAL COMPANY shall provide to the regulatory authority <br />within 30 days a detailed description of the method of abandoning bore <br />holes from the surface in order to prevent commingling of waters between <br />aquifers and/or of waters between the surface and aquifers. <br />9. Stipulation: ARCO COAL MUST SUBMIT TO THE DIVISION DETAILED PLANS FOR CAPPING <br />OF WELLS NO LATER THAN SEPTEMBER 30, 1981. ARCO COAL MUST SUBMIT TO THE <br />DIVISION DETAILED PLANS FOR THE SEALING OF PORTALS NO LATER THAN SIX (6) MONTHS <br />AFTER COMPLETION OF THE THREE (3) PORTALS INITIALLY PROPOSED TO BE INSTALLED <br />RND THEIR ASSOCIATED DEWATERING FACILITIES. <br />MLRD Findings Document: Stipulation No. 38, p. 45 <br />OSM Findings Document: This stipulation has not been included in the OSM <br />findings document. <br />OSM TEA: Stipulation No. 1, p. 8 as follows: <br />1. Stipulation: Submit detailed plans for sealing all mine openings and <br />abandoning wells. <br />10. Stipulation: ARCO COAL MUST SUBMIT TO THE DIVISION PLANS AND SPECIFICATIONS IN <br />ADEQUATE DETAIL, TO DEMONSTRATE THAT THE PROPOSED SEALING METHODS WILL NOT <br />- t <br />1. ~ ~ ~ <br />