My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL30617
DRMS
>
Back File Migration
>
General Documents
>
GENERAL30617
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:48:07 PM
Creation date
11/23/2007 6:45:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
General Documents
Doc Date
10/22/1981
Doc Name
Review of stips
From
MLR
To
FILE NO C-007-80
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br />OSM Findings Document: Stipulation No. 23, p. 8 <br />OSM TEA: Stipulation No. 18, p. 54 as follows: <br />18. Stipulation: Drainage waters from drainage basin 20 must be retained <br />with the appropriate structures to allow settling. The applicant shall <br />provide the regulatory agency with a complete sediment control plan for <br />drainage from this subbasin prior to initiation of construction. <br />NOTE: Stipulation No. 2 was inadvertantly repeated, in slightly different wording, <br />by both the State and OSM. See stipulation No. 7 of this memo. <br />3. Stipulation: THE APPLICANT MUST SECURE AUTHORIZATION FROM THE DIVISION TO <br />LOCATE SURFACE FACILITIES WITHIN THE STREAM BUFFER ZONE OF THE NORTH FORK. <br />THIS AUTHORIZATION MUST BE OBTAINED PRIOR TO INITIATING ANY DISTURBANCE TO <br />LOCATE SURFACE FACILITIES WITHIN THE BUFFER ZONE. <br />MLRD Findings Document: Stipulation No. 3, p. 2 <br />OSM Findings Document: Stipulation No. 28, p. 8 as follows: <br />28. The applicant must secure authorization form the regulatory authority to <br />locate surface facilities within the stream buffer zone of the North Fork. <br />OSM TEA: Stipulation No. 25, p. 72 (same wording as No. 28 in the OSM findings <br />document). <br />4. Stipulation: ARCO COAL COMPANY MUST PROVIDE TO THE DIVISION BY AUGUST 30, 1981 <br />SUFFICIENT DOCUMENTATION THAT ALL RECLAMATION FEES REQUIRED BY 30 CFR CHAPTER <br />VII, SUBCHAPTER R HAVE BEEN PAID BY ARCO COMPANY. <br />Y <br />~~ MLRD Findings Document: Stipulation No. 47, p. 48 <br />1 <br />1' ~L y~~1~~OSM Findings Ibcument: Stipulation No. 47, p. 12 <br />/ \\ <br />~'\~ OSM TEA: This has not been included in the OSM TER. <br />~~ ti <br />~;~~. Stipulation: PRIOR TO PLACEMENT OF DRAINAGE CULVERTS, ARCO COAL COMPANY SHALL <br />SUBMIT TO THE DIVISION BY SEPTEMBER 30, 1981 A REVISED DESIGN FOR PIPES 10 RND <br />I1 WHICH PROVIDES SUFFICIENT FLOW CAPACITY TO PREVENT DITCH OVERTOPPING. <br />MLRD Findings Document: Stipulation No. 35, p. 44 <br />OSM Findings Zocument: Stipulation No. 29 (first part). p. 9 <br />OSM TEA: Stipulation No. 34 (listed as "b" under Section 817.180), p. 189 <br />6. Stipulation: PRIOR TO PLACEMENT OF DRAINAGE CULVERTS, ARCO COAL COMPANY SHALL <br />SUBMIT TO THE DIVISION BY SEPTEMBER 30, 1981 A PLAN AND DESIGN DRAWINGS FOR <br />CULVERT TRASH RACKS TO BE INSTALLED ON PIPES OF 30 INCHES OR LESS WITHIN CROSS- <br />. SECTIONAL DIMENSION. <br />MLRD Findings IJOCUment: Stipulation No. 35, p. 44 <br />OSM Findings Document: Stipulation No. 29 (second part), p. 9 as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.