Laserfiche WebLink
-5- <br />INTERFERE WITH OR INTERRUPT THE PERMANENT OPERATION OF THE DRAINAGE SYSTEM. <br />THESE PLANS MUST BE SUBMITTED BY SEPTEMBER 30, 1981 IN THE CASE OF PLANS FOR <br />THE CAPPING OF WELLS AND, IN THE CASE OF PLANS FOR THE SEALING OF PORTALS, SUCH <br />PLANS MUST BE SUBMITTED SZX (6) MONTHS AFTER COMPLETION OF THE THREE (3J PORTALS <br />INITIALLY PROPOSED TO BE INSTALLED AND THEIR ASSOCIATED DEWATERING FACILITIES. <br />MLRD Findings Document: Stipulation No. 39, p. 45 <br />NOTE: This stipulation is substantially the same as stipulation No. 37 of this memo. <br />OSM Findings Ibcument: Stipulation No. 6, p. 5 as follows: <br />6. ARCO COAL must submit to the regulatory authority plans and specifications <br />for the sealing of portals and capping of wells to demonstrate that the <br />proposed sealing methods will not interfere with or interrupt the permanent <br />operation of the drainage system. <br />OSM TEA: Stipulation No. 2, p. 9 as follows: <br />2. Stipulation: In view of the location of the portals within a landslide <br />block, and due to the proposed permanent drainage system at the portal <br />benches to control movement of the block, the applicant shall submit <br />detailed plans and specifications adequate to determine that the proposed <br />devices will not interfere with, nor interrupt, the permanent operation of <br />the drainage system. <br />11. Stipulation: ARCO WILL SUBMIT TO THE DIVISION, PRIOR TO ANY TOPSOILING REMOVAL, <br />INFORMATION FROM A SOIL MONITORING PROGRAM (CONDUCTED PRIOR TO TOPSOIL STRIPPING) <br />IF THE MONITORING PROGRAM DEMONSTRATES THE LESS THAN 18 INCHES OF SUITABLE TOP- <br />SOIL IS AVAILABLE FOR REVEGETATION. INFORMATION FROM THE MONITORING PLAN WILL <br />BE USED BY ARCO COAL AND THE DIVISION TO ESTABLISH AN APPROVAL SOIL HANDLING PLAN. <br />MLRD Findings Document: Stipulation No. 26, p. 39 <br />OSM Findings Document: Stipulation No. 8, p. 6 <br />OSM TER: Stipulation No. 4, p. 17 <br />12. Stipulation: UNTIL SUCH TIME THAT ARCO CAN DEMONSTRATE TO THE DIVISION THE <br />FOLLOWING: 1) NON-COMBUSTIBILITY OF THE WASTE ROCK MATERIAL, 2) STABILITY OF <br />WASTE ROCK STOCKPILE, RND 3J NON-TOXICITY OF WASTE ROCK MATERIAL TO SURFACE AND <br />GROUND WATER AND VEGETATION, A FOUR FOOT COVER OF NON-TOXIC MATERIAL WILL BE <br />REQUIRED FOR THE WASTE ROCK STOCKPILE. <br />MLRD Findings Document: Stipulation No. 27, p. 39 <br />OSM Findings IJOCUment: Stipulation No. 9, p. 6 <br />OSM TEA: Stipulation No. 5, p. 17 <br />13. Stipulation: ARCO COAL MUST COMPLETE PHASE II OF THE GEOTECHNICAL AND HYDROLOGIC <br />STUDIES OF THE INITIAL WASTE PILE, AS OUTLINED IN PROPOSAL LETTER 3.2. ~1, INCLUDED <br />1 WITHIN THEIR PERMIT APPLICATION. ARCO IS FURTHER DIRECTED TO INCLUDE THE REPORT <br />~~ ENTITLED "REPORT, PRELIMINARY DESIGN RECOMMENDATIONS, INITIAL WASTE ROCK PILE, MT. <br />GUNNISON COAL MINE, SOMERSET, COLORADO, FOR ARCO COAL COMPANY", PREPARED BY GEO- <br />'~~HYDRO CONSULTANTS, INC. AS-AN EXHIBIT WITHIN THE PERMIT APPLICATION. FURTHER, <br />RRCO IS DIRECTED TO PREPARE APPROPRIATE DETAILED DESIGN NARRATIVE, PLANS AND CROSS- <br />SECTIONS OF THE INITIAL WASTE PILE, AND TO INCLUDE THEM WITHIN THE PERMIT APPLICATION. <br />THE DETAILED ENGINEERING DESIGN SHALL CONFORM WITH THE RECOMMENDATIONS OUTLINED <br />WITHIN THE GEO-HYDRO CONSULTANTS PHASE I REPORT. THE DETAILED ENGINEERING DESIGN <br />