Laserfiche WebLink
-I1- <br />7. Stipulation: The applicant shall provide to the regulatory <br />authority chemical analysis of the roof, interburden, and coal <br />from core holes SOM-2, SOM-6, SOM-38, SOM-50, SOM-59, SOM-65, and <br />MG-9. Only those parameters required by the regulatory authority <br />and most previously analyzed by the applicant (see appendix 1) <br />need be run. These analyses must be submitted within 6 months <br />after issuing this permit. <br />31. Stipulation: RRCO COAL MUST INCLUDE WITHIN THE PERMIT APPLICATION ALL <br />ARCO RESPONSES CONTAINED IN THE TWO VOLUMES TITLED "RESPONSES TO STATE <br />M.L.R. COMMENTS" AND "COMPLETENESS REVIEW RESPONSES". THIS MUST BE <br />COMPLETED WITHIN SIX MONTHS AFTER FINAL PERMIT APPROVAL BY THE DIVISION. <br />MLRD Findings Document: Stipulation No. 45, p. 48 <br />OSM Findings Document: Stipulation No. 2, p. 5 <br />~'J <br />OSM TEA: This stipulation has not been included in the TEA <br />32. Stipulation: THE APPLICANT SHALL CONDUCT R FIELD SURVEY OF ALL SPRINGS <br />BETWEEN THE DRY FORK OF MINNESOTA CREEK AND THE NORTH FORT OF THE GUNNISON <br />TO CONFIRM SOURCES O£ SPRING DISCHARGES (I.E. FAULTS, FRACTURES, LANDSLIDES, <br />ROCK FALLS, AND BEDDING CONTACTS) AND THE GEOLOGIC UNITS FROM WHICH THEY <br />EMANATE. THE APPLICANT SHALL PREPARE AND SUBMIT TO THE DIVISION A REPORT <br />WITH APPRORPRIATE MAPS, TABLES, AND DISCUSSION WITHIN 6 MONTHS OF THE <br />PERMIT ISSUING FOR INCLUSION WITHIN THE PERMIT APPLICATION. <br />MLRD Findings Document: Stipulation No. 4, p. 3 <br />OSM Findings Lbcument: Stipulation No. 14, p. 7 <br />OSM TER: Stipulation No. 16 (listed as No. 7 under Section 817.52(a)), p. 35 <br />as follows: <br />I6. Stipulation 7: The applicant sha1Z conduct a field survey of springs <br />to confirm sources of spring discharges (i.e., faults, fractures, land- <br />slides, rockfalls, bedrock contacts) and to delineate the geologic unit <br />from which they emanate. This data shall be provided to the regulatory <br />authority. <br />33. Stipulation: THE APPLICANT SHALL CONDUCT NEW PUMPING TESTS ON WELLS COMPLETED <br />IN THE BARREN MEMBER AND F SEAM. THE APPLICANT SHALL USE THE DATA FROM THESE <br />TESTS TO COMPUTE NEW ESTIMATES OF THE CONE OF INFLUENCE PRODUCED BY MINING, <br />THE QUANTITY OF MINE WATER WHICH MRY BE DEPLETED BY MINING. A REPORT CON- <br />TAINING THE DATA AND THE RESULTS FROM THE ABOVE TESTS AND CALCULATIONS SHALL <br />BE SUBMITTED TO THE DIVISION AS INCLUSIONS TO THE PERMIT APPLICATION WITHIN <br />6 MONTHS OF THE PERMIT ISSUING. <br />MLRD Findings Document: Stipulation No. 5, p. 4 <br />OSM Findings Document: Stipulation No. 11, p. 6 <br />OSM TEA: Stipulation No. 6, p. 29 as follows: <br />